In the process of migrating data to the current DDL platform, datasets with a large number of variables required splitting into multiple spreadsheets. They should be reassembled by the user to understand the data fully. This is the sixth spreadsheet of thirteenin the USAID Construction Assessment, Subawards. The USAID construction assessment is a survey of the character, scope, value and management of construction activities supported by USAID during the period from June 1, 2011 to June 20, 2013.
This dataset has the following 351 columns:
Column Name | API Column Name | Data Type | Description | Sample Values |
---|---|---|---|---|
region | region | text | DCHA/OTI Iraq Columbia Kosovo Europe and Eurasia view top 100 | |
build_ms_est_area_7_2_oe | build_ms_est_area_7_2_oe | number | BUILD_MS_EST_AREA_7_2_OE | -8 view top 100 |
build_ms_est_area_7_96 | build_ms_est_area_7_96 | number | Don t know | -8 view top 100 |
build_ms_energy_eff_7 | build_ms_energy_eff_7 | number | Type 7: BUILD_MS_TYPE-RC Energy efficiency standards required (-1: Don t Know, 0: No, 1: Yes) | -8 0 view top 100 |
build_ms_green_std_7 | build_ms_green_std_7 | number | Type 7: BUILD_MS_TYPE-RC Green building standards applied (e.g. LEED) (-1: Don t Know, 0: No, 1: Yes; describe standards:) | -8 1 view top 100 |
build_ms_green_std_7_oe | build_ms_green_std_7_oe | text | BUILD_MS_GREEN_STD_7_OE | Mixed energy: solar and grid view top 100 |
build_ms_non_haz_mate_7 | build_ms_non_haz_mate_7 | number | Type 7: BUILD_MS_TYPE-RC Specifications requiring use of safe, nonhazardous () | -8 1 view top 100 |
build_ms_non_haz_mate_7_oe | build_ms_non_haz_mate_7_oe | text | BUILD_MS_NON_HAZ_MATE_7_OE | USAID and local Environmental Regulations view top 100 |
build_ms_disab_7 | build_ms_disab_7 | number | Type 7: BUILD_MS_TYPE-RC Did Does the sub-award(s) incorporated design eleme (-1: Don t Know, 0: No, 1: Yes; describe standards:) | -8 0 view top 100 |
build_ms_disab_7_oe | build_ms_disab_7_oe | number | BUILD_MS_DISAB_7_OE | -8 view top 100 |
build_ms_plan_life_7 | build_ms_plan_life_7 | number | Type 7: BUILD_MS_TYPE-RC Planned designed economic life of the constructed (-1: Don t know, 1: Years) | -8 1 view top 100 |
build_ms_plan_life_7_oe | build_ms_plan_life_7_oe | number | BUILD_MS_PLAN_LIFE_7_OE | -8 20 view top 100 |
build_ms_est_life_7 | build_ms_est_life_7 | number | Type 7: BUILD_MS_TYPE-RC Estimated economic life of the constructed facility (-1: Don t know, 1: Years) | -8 1 view top 100 |
build_ms_est_life_7_oe | build_ms_est_life_7_oe | number | BUILD_MS_EST_LIFE_7_OE | -8 50 view top 100 |
build_ms_rework_7 | build_ms_rework_7 | number | Type 7: BUILD_MS_TYPE-RC Rework required not completed prior to award end da (1: Yes, minor defects, 2: Yes, major defects, 3: Yes, major requirements not met; estimate not usable:, 4: Yes, completely unusable, 5: No, 6: Don t know; explain:) | -8 1 view top 100 |
build_ms_rework_7_oe | build_ms_rework_7_oe | number | BUILD_MS_REWORK_7_OE | -8 view top 100 |
build_ms_gps_7_file | build_ms_gps_7_file | number | Type 7: BUILD_MS_GPS : File | -8 view top 100 |
build_ms_gps_7_gpscoordinates | build_ms_gps_7_gpscoordinates | text | Type 7: BUILD_MS_TYPE-RC GPS coordinates for all related construction struct | 13.1° North latitude; 86° West longitude 19.66091 -71.83633 view top 100 |
build_ms_gps_7_refusalmsg | build_ms_gps_7_refusalmsg | number | Type 7: BUILD_MS_GPS : Refusal Message | -8 view top 100 |
build_ms_const_location_8 | build_ms_const_location_8 | number | Type 8: BUILD_MS_TYPE-RC Construction location (1: New site no previous construction of any kind, 2: New on site with previous construction of any type, 3: Upgrade Expansion of existing facility, 4: Rehab of existing facility approximately same footprint) | -8 1 view top 100 |
build_ms_conflict_8 | build_ms_conflict_8 | number | Type 8: BUILD_MS_TYPE-RC Was Is construction in a conflict area? (-1: Don t Know, 0: No, 1: Yes) | -8 0 view top 100 |
build_ms_prefab_8 | build_ms_prefab_8 | number | Type 8: BUILD_MS_TYPE-RC Did this facility include any major pre-fabricated (-1: Don t Know, 0: No, 1: Yes) | -8 1 view top 100 |
build_ms_plan_sites_8 | build_ms_plan_sites_8 | number | Type 8: BUILD_MS_TYPE-RC Planned of sites (by location) | -8 view top 100 |
build_ms_plan_sites_8_1 | build_ms_plan_sites_8_1 | number | Urban: | -8 1 view top 100 |
build_ms_plan_sites_8_1_oe | build_ms_plan_sites_8_1_oe | number | BUILD_MS_PLAN_SITES_8_1_OE | -8 1 view top 100 |
build_ms_plan_sites_8_2 | build_ms_plan_sites_8_2 | number | Rural: | -8 view top 100 |
build_ms_plan_sites_8_2_oe | build_ms_plan_sites_8_2_oe | number | BUILD_MS_PLAN_SITES_8_2_OE | -8 view top 100 |
build_ms_plan_sites_8_96 | build_ms_plan_sites_8_96 | number | Don t know | -8 view top 100 |
build_ms_act_sites_8 | build_ms_act_sites_8 | number | Type 8: BUILD_MS_TYPE-RC Actual Estimated of sites (by location) | -8 view top 100 |
build_ms_act_sites_8_1 | build_ms_act_sites_8_1 | number | Urban: | -8 1 view top 100 |
build_ms_act_sites_8_1_oe | build_ms_act_sites_8_1_oe | number | BUILD_MS_ACT_SITES_8_1_OE | -8 1 view top 100 |
build_ms_act_sites_8_2 | build_ms_act_sites_8_2 | number | Rural: | -8 view top 100 |
build_ms_act_sites_8_2_oe | build_ms_act_sites_8_2_oe | number | BUILD_MS_ACT_SITES_8_2_OE | -8 view top 100 |
build_ms_act_sites_8_96 | build_ms_act_sites_8_96 | number | Don t know | -8 view top 100 |
build_ms_plan_area_8 | build_ms_plan_area_8 | number | Type 8: BUILD_MS_TYPE-RC Planned typical area per building (m2, by location) | -8 view top 100 |
build_ms_plan_area_8_1 | build_ms_plan_area_8_1 | number | Urban: | -8 1 view top 100 |
build_ms_plan_area_8_1_oe | build_ms_plan_area_8_1_oe | number | BUILD_MS_PLAN_AREA_8_1_OE | -8 550 view top 100 |
build_ms_plan_area_8_2 | build_ms_plan_area_8_2 | number | Rural: | -8 view top 100 |
build_ms_plan_area_8_2_oe | build_ms_plan_area_8_2_oe | number | BUILD_MS_PLAN_AREA_8_2_OE | -8 view top 100 |
build_ms_plan_area_8_96 | build_ms_plan_area_8_96 | number | Don t know | -8 view top 100 |
build_ms_est_area_8 | build_ms_est_area_8 | number | Type 8: BUILD_MS_TYPE-RC Estimated typical area per building (m2, by locatio | -8 view top 100 |
build_ms_est_area_8_1 | build_ms_est_area_8_1 | number | Urban: | -8 1 view top 100 |
build_ms_est_area_8_1_oe | build_ms_est_area_8_1_oe | number | BUILD_MS_EST_AREA_8_1_OE | -8 550 view top 100 |
build_ms_est_area_8_2 | build_ms_est_area_8_2 | number | Rural: | -8 view top 100 |
build_ms_est_area_8_2_oe | build_ms_est_area_8_2_oe | number | BUILD_MS_EST_AREA_8_2_OE | -8 view top 100 |
build_ms_est_area_8_96 | build_ms_est_area_8_96 | number | Don t know | -8 view top 100 |
build_ms_energy_eff_8 | build_ms_energy_eff_8 | number | Type 8: BUILD_MS_TYPE-RC Energy efficiency standards required (-1: Don t Know, 0: No, 1: Yes) | -8 0 view top 100 |
build_ms_green_std_8 | build_ms_green_std_8 | number | Type 8: BUILD_MS_TYPE-RC Green building standards applied (e.g. LEED) (-1: Don t Know, 0: No, 1: Yes; describe standards:) | -8 0 view top 100 |
build_ms_green_std_8_oe | build_ms_green_std_8_oe | number | BUILD_MS_GREEN_STD_8_OE | -8 view top 100 |
build_ms_non_haz_mate_8 | build_ms_non_haz_mate_8 | number | Type 8: BUILD_MS_TYPE-RC Specifications requiring use of safe, nonhazardous () | -8 1 view top 100 |
build_ms_non_haz_mate_8_oe | build_ms_non_haz_mate_8_oe | text | BUILD_MS_NON_HAZ_MATE_8_OE | USAID and Local Environmental Regulations view top 100 |
build_ms_disab_8 | build_ms_disab_8 | number | Type 8: BUILD_MS_TYPE-RC Did Does the sub-award(s) incorporated design eleme (-1: Don t Know, 0: No, 1: Yes; describe standards:) | -8 0 view top 100 |
build_ms_disab_8_oe | build_ms_disab_8_oe | number | BUILD_MS_DISAB_8_OE | -8 view top 100 |
build_ms_plan_life_8 | build_ms_plan_life_8 | number | Type 8: BUILD_MS_TYPE-RC Planned designed economic life of the constructed (-1: Don t know, 1: Years) | -8 1 view top 100 |
build_ms_plan_life_8_oe | build_ms_plan_life_8_oe | number | BUILD_MS_PLAN_LIFE_8_OE | -8 20 view top 100 |
build_ms_est_life_8 | build_ms_est_life_8 | number | Type 8: BUILD_MS_TYPE-RC Estimated economic life of the constructed facility (-1: Don t know, 1: Years) | -8 1 view top 100 |
build_ms_est_life_8_oe | build_ms_est_life_8_oe | number | BUILD_MS_EST_LIFE_8_OE | -8 50 view top 100 |
build_ms_rework_8 | build_ms_rework_8 | number | Type 8: BUILD_MS_TYPE-RC Rework required not completed prior to award end da (1: Yes, minor defects, 2: Yes, major defects, 3: Yes, major requirements not met; estimate not usable:, 4: Yes, completely unusable, 5: No, 6: Don t know; explain:) | -8 1 view top 100 |
build_ms_rework_8_oe | build_ms_rework_8_oe | number | BUILD_MS_REWORK_8_OE | -8 view top 100 |
build_ms_gps_8_file | build_ms_gps_8_file | number | Type 8: BUILD_MS_GPS : File | -8 view top 100 |
build_ms_gps_8_gpscoordinates | build_ms_gps_8_gpscoordinates | text | Type 8: BUILD_MS_TYPE-RC GPS coordinates for all related construction struct | 13.1° North latitude; 86° West longitude 9.36542824687 80.3334904579 9.14827289719 80.7906068633 view top 100 |
build_ms_gps_8_refusalmsg | build_ms_gps_8_refusalmsg | number | Type 8: BUILD_MS_GPS : Refusal Message | -8 view top 100 |
build_ms_const_location_9 | build_ms_const_location_9 | number | Type 9: BUILD_MS_TYPE-RC Construction location (1: New site no previous construction of any kind, 2: New on site with previous construction of any type, 3: Upgrade Expansion of existing facility, 4: Rehab of existing facility approximately same footprint) | -8 4 3 -6 1 view top 100 |
build_ms_conflict_9 | build_ms_conflict_9 | number | Type 9: BUILD_MS_TYPE-RC Was Is construction in a conflict area? (-1: Don t Know, 0: No, 1: Yes) | -8 0 -6 -1 1 view top 100 |
build_ms_prefab_9 | build_ms_prefab_9 | number | Type 9: BUILD_MS_TYPE-RC Did this facility include any major pre-fabricated (-1: Don t Know, 0: No, 1: Yes) | -8 -1 0 -6 view top 100 |
build_ms_plan_sites_9 | build_ms_plan_sites_9 | number | Type 9: BUILD_MS_TYPE-RC Planned of sites (by location) | -8 -6 view top 100 |
build_ms_plan_sites_9_1 | build_ms_plan_sites_9_1 | number | Urban: | -8 1 view top 100 |
build_ms_plan_sites_9_1_oe | build_ms_plan_sites_9_1_oe | number | BUILD_MS_PLAN_SITES_9_1_OE | -8 1 view top 100 |
build_ms_plan_sites_9_2 | build_ms_plan_sites_9_2 | number | Rural: | -8 1 view top 100 |
build_ms_plan_sites_9_2_oe | build_ms_plan_sites_9_2_oe | number | BUILD_MS_PLAN_SITES_9_2_OE | -8 1 view top 100 |
build_ms_plan_sites_9_96 | build_ms_plan_sites_9_96 | number | Don t know | -8 1 view top 100 |
build_ms_act_sites_9 | build_ms_act_sites_9 | number | Type 9: BUILD_MS_TYPE-RC Actual Estimated of sites (by location) | -8 -6 view top 100 |
build_ms_act_sites_9_1 | build_ms_act_sites_9_1 | number | Urban: | -8 1 view top 100 |
build_ms_act_sites_9_1_oe | build_ms_act_sites_9_1_oe | number | BUILD_MS_ACT_SITES_9_1_OE | -8 1 view top 100 |
build_ms_act_sites_9_2 | build_ms_act_sites_9_2 | number | Rural: | -8 1 view top 100 |
build_ms_act_sites_9_2_oe | build_ms_act_sites_9_2_oe | number | BUILD_MS_ACT_SITES_9_2_OE | -8 1 view top 100 |
build_ms_act_sites_9_96 | build_ms_act_sites_9_96 | number | Don t know | -8 1 view top 100 |
build_ms_plan_area_9 | build_ms_plan_area_9 | number | Type 9: BUILD_MS_TYPE-RC Planned typical area per building (m2, by location) | -8 -6 view top 100 |
build_ms_plan_area_9_1 | build_ms_plan_area_9_1 | number | Urban: | -8 1 view top 100 |
build_ms_plan_area_9_1_oe | build_ms_plan_area_9_1_oe | number | BUILD_MS_PLAN_AREA_9_1_OE | -8 100 150 1600 view top 100 |
build_ms_plan_area_9_2 | build_ms_plan_area_9_2 | number | Rural: | -8 1 view top 100 |
build_ms_plan_area_9_2_oe | build_ms_plan_area_9_2_oe | number | BUILD_MS_PLAN_AREA_9_2_OE | -8 150 view top 100 |
build_ms_plan_area_9_96 | build_ms_plan_area_9_96 | number | Don t know | -8 1 view top 100 |
build_ms_est_area_9 | build_ms_est_area_9 | number | Type 9: BUILD_MS_TYPE-RC Estimated typical area per building (m2, by locatio | -8 -6 view top 100 |
build_ms_est_area_9_1 | build_ms_est_area_9_1 | number | Urban: | -8 1 view top 100 |
build_ms_est_area_9_1_oe | build_ms_est_area_9_1_oe | number | BUILD_MS_EST_AREA_9_1_OE | -8 100 150 1600 view top 100 |
build_ms_est_area_9_2 | build_ms_est_area_9_2 | number | Rural: | -8 1 view top 100 |
build_ms_est_area_9_2_oe | build_ms_est_area_9_2_oe | number | BUILD_MS_EST_AREA_9_2_OE | -8 311 500 581 150 view top 100 |
build_ms_est_area_9_96 | build_ms_est_area_9_96 | number | Don t know | -8 1 view top 100 |
build_ms_energy_eff_9 | build_ms_energy_eff_9 | number | Type 9: BUILD_MS_TYPE-RC Energy efficiency standards required (-1: Don t Know, 0: No, 1: Yes) | -8 -1 -6 1 0 view top 100 |
build_ms_green_std_9 | build_ms_green_std_9 | number | Type 9: BUILD_MS_TYPE-RC Green building standards applied (e.g. LEED) (-1: Don t Know, 0: No, 1: Yes; describe standards:) | -8 -1 1 -6 0 view top 100 |
build_ms_green_std_9_oe | build_ms_green_std_9_oe | text | BUILD_MS_GREEN_STD_9_OE | EU, Cyprus standards view top 100 |
build_ms_non_haz_mate_9 | build_ms_non_haz_mate_9 | number | Type 9: BUILD_MS_TYPE-RC Specifications requiring use of safe, nonhazardous () | -8 -1 1 -6 view top 100 |
build_ms_non_haz_mate_9_oe | build_ms_non_haz_mate_9_oe | text | BUILD_MS_NON_HAZ_MATE_9_OE | EU, Cyprus standards EU standards view top 100 |
build_ms_disab_9 | build_ms_disab_9 | number | Type 9: BUILD_MS_TYPE-RC Did Does the sub-award(s) incorporated design eleme (-1: Don t Know, 0: No, 1: Yes; describe standards:) | -8 -1 0 -6 1 view top 100 |
build_ms_disab_9_oe | build_ms_disab_9_oe | text | BUILD_MS_DISAB_9_OE | EU, Cyprus standards view top 100 |
build_ms_plan_life_9 | build_ms_plan_life_9 | number | Type 9: BUILD_MS_TYPE-RC Planned designed economic life of the constructed (-1: Don t know, 1: Years) | -8 -1 -6 1 view top 100 |
build_ms_plan_life_9_oe | build_ms_plan_life_9_oe | number | BUILD_MS_PLAN_LIFE_9_OE | -8 20 view top 100 |
build_ms_est_life_9 | build_ms_est_life_9 | number | Type 9: BUILD_MS_TYPE-RC Estimated economic life of the constructed facility (-1: Don t know, 1: Years) | -8 -1 -6 1 view top 100 |
build_ms_est_life_9_oe | build_ms_est_life_9_oe | number | BUILD_MS_EST_LIFE_9_OE | -8 20 view top 100 |
build_ms_rework_9 | build_ms_rework_9 | number | Type 9: BUILD_MS_TYPE-RC Rework required not completed prior to award end da (1: Yes, minor defects, 2: Yes, major defects, 3: Yes, major requirements not met; estimate not usable:, 4: Yes, completely unusable, 5: No, 6: Don t know; explain:) | -8 5 -6 1 view top 100 |
build_ms_rework_9_oe | build_ms_rework_9_oe | number | BUILD_MS_REWORK_9_OE | -8 view top 100 |
build_ms_gps_9_file | build_ms_gps_9_file | number | Type 9: BUILD_MS_GPS : File | -8 view top 100 |
build_ms_gps_9_gpscoordinates | build_ms_gps_9_gpscoordinates | text | Type 9: BUILD_MS_TYPE-RC GPS coordinates for all related construction struct | 18.474447 -72.270513 18.474447 -72.270513 35.174755, 33.357646 35.174755, 33.357646; 35.13009, 33.080247 35.175198, 33.357907 no data available view top 100 |
build_ms_gps_9_refusalmsg | build_ms_gps_9_refusalmsg | text | Type 9: BUILD_MS_GPS : Refusal Message | E3 Bureau has informed Europe & Eurasia Regional program that it does not need to provide GPS coordinates. E3 Bureau has indicated that Europe & Eurasia regional program does not need to provide GPS coordinates. no data available No information provided or in files. view top 100 |
build_ms_const_location_10 | build_ms_const_location_10 | number | Type 10: BUILD_MS_TYPE-RC Construction location (1: New site no previous construction of any kind, 2: New on site with previous construction of any type, 3: Upgrade Expansion of existing facility, 4: Rehab of existing facility approximately same footprint) | -8 view top 100 |
build_ms_conflict_10 | build_ms_conflict_10 | number | Type 10: BUILD_MS_TYPE-RC Was Is construction in a conflict area? (-1: Don t Know, 0: No, 1: Yes) | -8 view top 100 |
build_ms_prefab_10 | build_ms_prefab_10 | number | Type 10: BUILD_MS_TYPE-RC Did this facility include any major pre-fabricated (-1: Don t Know, 0: No, 1: Yes) | -8 view top 100 |
build_ms_plan_sites_10 | build_ms_plan_sites_10 | number | Type 10: BUILD_MS_TYPE-RC Planned of sites (by location) | -8 view top 100 |
build_ms_plan_sites_10_1 | build_ms_plan_sites_10_1 | number | Urban: | -8 view top 100 |
build_ms_plan_sites_10_1_oe | build_ms_plan_sites_10_1_1 | number | BUILD_MS_PLAN_SITES_10_1_OE | -8 view top 100 |
build_ms_plan_sites_10_2 | build_ms_plan_sites_10_2 | number | Rural: | -8 view top 100 |
build_ms_plan_sites_10_2_oe | build_ms_plan_sites_10_2_1 | number | BUILD_MS_PLAN_SITES_10_2_OE | -8 view top 100 |
build_ms_plan_sites_10_96 | build_ms_plan_sites_10_96 | number | Don t know | -8 view top 100 |
build_ms_act_sites_10 | build_ms_act_sites_10 | number | Type 10: BUILD_MS_TYPE-RC Actual Estimated of sites (by location) | -8 view top 100 |
build_ms_act_sites_10_1 | build_ms_act_sites_10_1 | number | Urban: | -8 view top 100 |
build_ms_act_sites_10_1_oe | build_ms_act_sites_10_1_oe | number | BUILD_MS_ACT_SITES_10_1_OE | -8 view top 100 |
build_ms_act_sites_10_2 | build_ms_act_sites_10_2 | number | Rural: | -8 view top 100 |
build_ms_act_sites_10_2_oe | build_ms_act_sites_10_2_oe | number | BUILD_MS_ACT_SITES_10_2_OE | -8 view top 100 |
build_ms_act_sites_10_96 | build_ms_act_sites_10_96 | number | Don t know | -8 view top 100 |
build_ms_plan_area_10 | build_ms_plan_area_10 | number | Type 10: BUILD_MS_TYPE-RC Planned typical area per building (m2, by location | -8 view top 100 |
build_ms_plan_area_10_1 | build_ms_plan_area_10_1 | number | Urban: | -8 view top 100 |
build_ms_plan_area_10_1_oe | build_ms_plan_area_10_1_oe | number | BUILD_MS_PLAN_AREA_10_1_OE | -8 view top 100 |
build_ms_plan_area_10_2 | build_ms_plan_area_10_2 | number | Rural: | -8 view top 100 |
build_ms_plan_area_10_2_oe | build_ms_plan_area_10_2_oe | number | BUILD_MS_PLAN_AREA_10_2_OE | -8 view top 100 |
build_ms_plan_area_10_96 | build_ms_plan_area_10_96 | number | Don t know | -8 view top 100 |
build_ms_est_area_10 | build_ms_est_area_10 | number | Type 10: BUILD_MS_TYPE-RC Estimated typical area per building (m2, by locati | -8 view top 100 |
build_ms_est_area_10_1 | build_ms_est_area_10_1 | number | Urban: | -8 view top 100 |
build_ms_est_area_10_1_oe | build_ms_est_area_10_1_oe | number | BUILD_MS_EST_AREA_10_1_OE | -8 view top 100 |
build_ms_est_area_10_2 | build_ms_est_area_10_2 | number | Rural: | -8 view top 100 |
build_ms_est_area_10_2_oe | build_ms_est_area_10_2_oe | number | BUILD_MS_EST_AREA_10_2_OE | -8 view top 100 |
build_ms_est_area_10_96 | build_ms_est_area_10_96 | number | Don t know | -8 view top 100 |
build_ms_energy_eff_10 | build_ms_energy_eff_10 | number | Type 10: BUILD_MS_TYPE-RC Energy efficiency standards required (-1: Don t Know, 0: No, 1: Yes) | -8 view top 100 |
build_ms_green_std_10 | build_ms_green_std_10 | number | Type 10: BUILD_MS_TYPE-RC Green building standards applied (e.g. LEED) (-1: Don t Know, 0: No, 1: Yes; describe standards:) | -8 view top 100 |
build_ms_green_std_10_oe | build_ms_green_std_10_oe | number | BUILD_MS_GREEN_STD_10_OE | -8 view top 100 |
build_ms_non_haz_mate_10 | build_ms_non_haz_mate_10 | number | Type 10: BUILD_MS_TYPE-RC Specifications requiring use of safe, nonhazardous () | -8 view top 100 |
build_ms_non_haz_mate_10_oe | build_ms_non_haz_mate_10_1 | number | BUILD_MS_NON_HAZ_MATE_10_OE | -8 view top 100 |
build_ms_disab_10 | build_ms_disab_10 | number | Type 10: BUILD_MS_TYPE-RC Did Does the sub-award(s) incorporated design elem (-1: Don t Know, 0: No, 1: Yes; describe standards:) | -8 view top 100 |
build_ms_disab_10_oe | build_ms_disab_10_oe | number | BUILD_MS_DISAB_10_OE | -8 view top 100 |
build_ms_plan_life_10 | build_ms_plan_life_10 | number | Type 10: BUILD_MS_TYPE-RC Planned designed economic life of the constructed (-1: Don t know, 1: Years) | -8 view top 100 |
build_ms_plan_life_10_oe | build_ms_plan_life_10_oe | number | BUILD_MS_PLAN_LIFE_10_OE | -8 view top 100 |
build_ms_est_life_10 | build_ms_est_life_10 | number | Type 10: BUILD_MS_TYPE-RC Estimated economic life of the constructed facilit (-1: Don t know, 1: Years) | -8 view top 100 |
build_ms_est_life_10_oe | build_ms_est_life_10_oe | number | BUILD_MS_EST_LIFE_10_OE | -8 view top 100 |
build_ms_rework_10 | build_ms_rework_10 | number | Type 10: BUILD_MS_TYPE-RC Rework required not completed prior to award end d (1: Yes, minor defects, 2: Yes, major defects, 3: Yes, major requirements not met; estimate not usable:, 4: Yes, completely unusable, 5: No, 6: Don t know; explain:) | -8 view top 100 |
build_ms_rework_10_oe | build_ms_rework_10_oe | number | BUILD_MS_REWORK_10_OE | -8 view top 100 |
build_ms_gps_10_file | build_ms_gps_10_file | number | Type 10: BUILD_MS_GPS : File | -8 view top 100 |
build_ms_gps_10_gpscoordinates | build_ms_gps_10_gpscoordinates | number | Type 10: BUILD_MS_TYPE-RC GPS coordinates for all related construction struc | -8 view top 100 |
build_ms_gps_10_refusalmsg | build_ms_gps_10_refusalmsg | number | Type 10: BUILD_MS_GPS : Refusal Message | -8 view top 100 |
build_ms_const_location_11 | build_ms_const_location_11 | number | Type 11: BUILD_MS_TYPE-RC Construction location (1: New site no previous construction of any kind, 2: New on site with previous construction of any type, 3: Upgrade Expansion of existing facility, 4: Rehab of existing facility approximately same footprint) | -8 view top 100 |
build_ms_conflict_11 | build_ms_conflict_11 | number | Type 11: BUILD_MS_TYPE-RC Was Is construction in a conflict area? (-1: Don t Know, 0: No, 1: Yes) | -8 view top 100 |
build_ms_prefab_11 | build_ms_prefab_11 | number | Type 11: BUILD_MS_TYPE-RC Did this facility include any major pre-fabricated (-1: Don t Know, 0: No, 1: Yes) | -8 view top 100 |
build_ms_plan_sites_11 | build_ms_plan_sites_11 | number | Type 11: BUILD_MS_TYPE-RC Planned of sites (by location) | -8 view top 100 |
build_ms_plan_sites_11_1 | build_ms_plan_sites_11_1 | number | Urban: | -8 view top 100 |
build_ms_plan_sites_11_1_oe | build_ms_plan_sites_11_1_1 | number | BUILD_MS_PLAN_SITES_11_1_OE | -8 view top 100 |
build_ms_plan_sites_11_2 | build_ms_plan_sites_11_2 | number | Rural: | -8 view top 100 |
build_ms_plan_sites_11_2_oe | build_ms_plan_sites_11_2_1 | number | BUILD_MS_PLAN_SITES_11_2_OE | -8 view top 100 |
build_ms_plan_sites_11_96 | build_ms_plan_sites_11_96 | number | Don t know | -8 view top 100 |
build_ms_act_sites_11 | build_ms_act_sites_11 | number | Type 11: BUILD_MS_TYPE-RC Actual Estimated of sites (by location) | -8 view top 100 |
build_ms_act_sites_11_1 | build_ms_act_sites_11_1 | number | Urban: | -8 view top 100 |
build_ms_act_sites_11_1_oe | build_ms_act_sites_11_1_oe | number | BUILD_MS_ACT_SITES_11_1_OE | -8 view top 100 |
build_ms_act_sites_11_2 | build_ms_act_sites_11_2 | number | Rural: | -8 view top 100 |
build_ms_act_sites_11_2_oe | build_ms_act_sites_11_2_oe | number | BUILD_MS_ACT_SITES_11_2_OE | -8 view top 100 |
build_ms_act_sites_11_96 | build_ms_act_sites_11_96 | number | Don t know | -8 view top 100 |
build_ms_plan_area_11 | build_ms_plan_area_11 | number | Type 11: BUILD_MS_TYPE-RC Planned typical area per building (m2, by location | -8 view top 100 |
build_ms_plan_area_11_1 | build_ms_plan_area_11_1 | number | Urban: | -8 view top 100 |
build_ms_plan_area_11_1_oe | build_ms_plan_area_11_1_oe | number | BUILD_MS_PLAN_AREA_11_1_OE | -8 view top 100 |
build_ms_plan_area_11_2 | build_ms_plan_area_11_2 | number | Rural: | -8 view top 100 |
build_ms_plan_area_11_2_oe | build_ms_plan_area_11_2_oe | number | BUILD_MS_PLAN_AREA_11_2_OE | -8 view top 100 |
build_ms_plan_area_11_96 | build_ms_plan_area_11_96 | number | Don t know | -8 view top 100 |
build_ms_est_area_11 | build_ms_est_area_11 | number | Type 11: BUILD_MS_TYPE-RC Estimated typical area per building (m2, by locati | -8 view top 100 |
build_ms_est_area_11_1 | build_ms_est_area_11_1 | number | Urban: | -8 view top 100 |
build_ms_est_area_11_1_oe | build_ms_est_area_11_1_oe | number | BUILD_MS_EST_AREA_11_1_OE | -8 view top 100 |
build_ms_est_area_11_2 | build_ms_est_area_11_2 | number | Rural: | -8 view top 100 |
build_ms_est_area_11_2_oe | build_ms_est_area_11_2_oe | number | BUILD_MS_EST_AREA_11_2_OE | -8 view top 100 |
build_ms_est_area_11_96 | build_ms_est_area_11_96 | number | Don t know | -8 view top 100 |
build_ms_energy_eff_11 | build_ms_energy_eff_11 | number | Type 11: BUILD_MS_TYPE-RC Energy efficiency standards required (-1: Don t Know, 0: No, 1: Yes) | -8 view top 100 |
build_ms_green_std_11 | build_ms_green_std_11 | number | Type 11: BUILD_MS_TYPE-RC Green building standards applied (e.g. LEED) (-1: Don t Know, 0: No, 1: Yes; describe standards:) | -8 view top 100 |
build_ms_green_std_11_oe | build_ms_green_std_11_oe | number | BUILD_MS_GREEN_STD_11_OE | -8 view top 100 |
build_ms_non_haz_mate_11 | build_ms_non_haz_mate_11 | number | Type 11: BUILD_MS_TYPE-RC Specifications requiring use of safe, nonhazardous () | -8 view top 100 |
build_ms_non_haz_mate_11_oe | build_ms_non_haz_mate_11_1 | number | BUILD_MS_NON_HAZ_MATE_11_OE | -8 view top 100 |
build_ms_disab_11 | build_ms_disab_11 | number | Type 11: BUILD_MS_TYPE-RC Did Does the sub-award(s) incorporated design elem (-1: Don t Know, 0: No, 1: Yes; describe standards:) | -8 view top 100 |
build_ms_disab_11_oe | build_ms_disab_11_oe | number | BUILD_MS_DISAB_11_OE | -8 view top 100 |
build_ms_plan_life_11 | build_ms_plan_life_11 | number | Type 11: BUILD_MS_TYPE-RC Planned designed economic life of the constructed (-1: Don t know, 1: Years) | -8 view top 100 |
build_ms_plan_life_11_oe | build_ms_plan_life_11_oe | number | BUILD_MS_PLAN_LIFE_11_OE | -8 view top 100 |
build_ms_est_life_11 | build_ms_est_life_11 | number | Type 11: BUILD_MS_TYPE-RC Estimated economic life of the constructed facilit (-1: Don t know, 1: Years) | -8 view top 100 |
build_ms_est_life_11_oe | build_ms_est_life_11_oe | number | BUILD_MS_EST_LIFE_11_OE | -8 view top 100 |
build_ms_rework_11 | build_ms_rework_11 | number | Type 11: BUILD_MS_TYPE-RC Rework required not completed prior to award end d (1: Yes, minor defects, 2: Yes, major defects, 3: Yes, major requirements not met; estimate not usable:, 4: Yes, completely unusable, 5: No, 6: Don t know; explain:) | -8 view top 100 |
build_ms_rework_11_oe | build_ms_rework_11_oe | number | BUILD_MS_REWORK_11_OE | -8 view top 100 |
build_ms_gps_11_file | build_ms_gps_11_file | number | Type 11: BUILD_MS_GPS : File | -8 view top 100 |
build_ms_gps_11_gpscoordinates | build_ms_gps_11_gpscoordinates | number | Type 11: BUILD_MS_TYPE-RC GPS coordinates for all related construction struc | -8 view top 100 |
build_ms_gps_11_refusalmsg | build_ms_gps_11_refusalmsg | number | Type 11: BUILD_MS_GPS : Refusal Message | -8 view top 100 |
build_ms_const_location_12 | build_ms_const_location_12 | number | Type 12: BUILD_MS_TYPE-RC Construction location (1: New site no previous construction of any kind, 2: New on site with previous construction of any type, 3: Upgrade Expansion of existing facility, 4: Rehab of existing facility approximately same footprint) | -8 4 1 2 3 view top 100 |
build_ms_conflict_12 | build_ms_conflict_12 | number | Type 12: BUILD_MS_TYPE-RC Was Is construction in a conflict area? (-1: Don t Know, 0: No, 1: Yes) | -8 0 1 -6 -1 view top 100 |
build_ms_prefab_12 | build_ms_prefab_12 | number | Type 12: BUILD_MS_TYPE-RC Did this facility include any major pre-fabricated (-1: Don t Know, 0: No, 1: Yes) | -8 -1 0 1 -6 view top 100 |
build_ms_plan_sites_12 | build_ms_plan_sites_12 | number | Type 12: BUILD_MS_TYPE-RC Planned of sites (by location) | -8 -6 view top 100 |
build_ms_plan_sites_12_1 | build_ms_plan_sites_12_1 | number | Urban: | -8 1 view top 100 |
build_ms_plan_sites_12_1_oe | build_ms_plan_sites_12_1_1 | number | BUILD_MS_PLAN_SITES_12_1_OE | 1.0 3.0 5.0 2.0 6.0 view top 100 |
build_ms_plan_sites_12_2 | build_ms_plan_sites_12_2 | number | Rural: | -8 1 view top 100 |
build_ms_plan_sites_12_2_oe | build_ms_plan_sites_12_2_1 | number | BUILD_MS_PLAN_SITES_12_2_OE | -8 1 2 3 4 view top 100 |
build_ms_plan_sites_12_96 | build_ms_plan_sites_12_96 | number | Don t know | -8 1 view top 100 |
build_ms_act_sites_12 | build_ms_act_sites_12 | number | Type 12: BUILD_MS_TYPE-RC Actual Estimated of sites (by location) | -8 -6 view top 100 |
build_ms_act_sites_12_1 | build_ms_act_sites_12_1 | number | Urban: | -8 1 view top 100 |
build_ms_act_sites_12_1_oe | build_ms_act_sites_12_1_oe | number | BUILD_MS_ACT_SITES_12_1_OE | -8 1 3 5 2 view top 100 |
build_ms_act_sites_12_2 | build_ms_act_sites_12_2 | number | Rural: | -8 1 view top 100 |
build_ms_act_sites_12_2_oe | build_ms_act_sites_12_2_oe | number | BUILD_MS_ACT_SITES_12_2_OE | -8 1 2 3 7 view top 100 |
build_ms_act_sites_12_96 | build_ms_act_sites_12_96 | number | Don t know | -8 1 view top 100 |
build_ms_plan_area_12 | build_ms_plan_area_12 | number | Type 12: BUILD_MS_TYPE-RC Planned typical area per building (m2, by location | -8 -6 view top 100 |
build_ms_plan_area_12_1 | build_ms_plan_area_12_1 | number | Urban: | -8 1 view top 100 |
build_ms_plan_area_12_1_oe | build_ms_plan_area_12_1_oe | number | BUILD_MS_PLAN_AREA_12_1_OE | 200.0 5.0 7.0 20.0 90.0 view top 100 |
build_ms_plan_area_12_2 | build_ms_plan_area_12_2 | number | Rural: | -8 1 view top 100 |
build_ms_plan_area_12_2_oe | build_ms_plan_area_12_2_oe | number | BUILD_MS_PLAN_AREA_12_2_OE | 200.0 400.0 600.0 650.0 700.0 view top 100 |
build_ms_plan_area_12_96 | build_ms_plan_area_12_96 | number | Don t know | -8 1 view top 100 |
build_ms_est_area_12 | build_ms_est_area_12 | number | Type 12: BUILD_MS_TYPE-RC Estimated typical area per building (m2, by locati | -8 -6 view top 100 |
build_ms_est_area_12_1 | build_ms_est_area_12_1 | number | Urban: | -8 1 view top 100 |
build_ms_est_area_12_1_oe | build_ms_est_area_12_1_oe | text | BUILD_MS_EST_AREA_12_1_OE | 200 1273 131 1394 142 view top 100 |
build_ms_est_area_12_2 | build_ms_est_area_12_2 | number | Rural: | -8 1 view top 100 |
build_ms_est_area_12_2_oe | build_ms_est_area_12_2_oe | number | BUILD_MS_EST_AREA_12_2_OE | 200.0 311.0 400.0 600.0 700.0 view top 100 |
build_ms_est_area_12_96 | build_ms_est_area_12_96 | number | Don t know | -8 1 view top 100 |
build_ms_energy_eff_12 | build_ms_energy_eff_12 | number | Type 12: BUILD_MS_TYPE-RC Energy efficiency standards required (-1: Don t Know, 0: No, 1: Yes) | -8 -1 1 0 -6 view top 100 |
build_ms_green_std_12 | build_ms_green_std_12 | number | Type 12: BUILD_MS_TYPE-RC Green building standards applied (e.g. LEED) (-1: Don t Know, 0: No, 1: Yes; describe standards:) | -8 -1 0 -6 1 view top 100 |
build_ms_green_std_12_oe | build_ms_green_std_12_oe | text | BUILD_MS_GREEN_STD_12_OE | Fiontarlann provides free renewable energy heating for client businesses. LEED related local standards view top 100 |
build_ms_non_haz_mate_12 | build_ms_non_haz_mate_12 | number | Type 12: BUILD_MS_TYPE-RC Specifications requiring use of safe, nonhazardous () | -8 -1 1 -6 view top 100 |
build_ms_non_haz_mate_12_oe | build_ms_non_haz_mate_12_1 | text | BUILD_MS_NON_HAZ_MATE_12_OE | Local Standards US international US Standards local standards view top 100 |
build_ms_disab_12 | build_ms_disab_12 | number | Type 12: BUILD_MS_TYPE-RC Did Does the sub-award(s) incorporated design elem (-1: Don t Know, 0: No, 1: Yes; describe standards:) | -8 -1 1 0 -6 view top 100 |
build_ms_disab_12_oe | build_ms_disab_12_oe | text | BUILD_MS_DISAB_12_OE | ADA ADA and local standards American Based on ADA local view top 100 |
build_ms_plan_life_12 | build_ms_plan_life_12 | number | Type 12: BUILD_MS_TYPE-RC Planned designed economic life of the constructed (-1: Don t know, 1: Years) | -8 -1 1 -6 view top 100 |
build_ms_plan_life_12_oe | build_ms_plan_life_12_oe | number | BUILD_MS_PLAN_LIFE_12_OE | -8 20 25 100 view top 100 |
build_ms_est_life_12 | build_ms_est_life_12 | number | Type 12: BUILD_MS_TYPE-RC Estimated economic life of the constructed facilit (-1: Don t know, 1: Years) | -8 -1 1 -6 view top 100 |
build_ms_est_life_12_oe | build_ms_est_life_12_oe | number | BUILD_MS_EST_LIFE_12_OE | -8 20 25 50 100 view top 100 |
build_ms_rework_12 | build_ms_rework_12 | number | Type 12: BUILD_MS_TYPE-RC Rework required not completed prior to award end d (1: Yes, minor defects, 2: Yes, major defects, 3: Yes, major requirements not met; estimate not usable:, 4: Yes, completely unusable, 5: No, 6: Don t know; explain:) | -8 5 -6 6 view top 100 |
build_ms_rework_12_oe | build_ms_rework_12_oe | text | BUILD_MS_REWORK_12_OE | no no docs view top 100 |
build_ms_gps_12_file | build_ms_gps_12_file | number | Type 12: BUILD_MS_GPS : File | -8 view top 100 |
build_ms_gps_12_gpscoordinates | build_ms_gps_12_gpscoordinates | text | Type 12: BUILD_MS_TYPE-RC GPS coordinates for all related construction struc | 49° 50' 22.86"N 24° 1' 46.98"E 42dg53'12'N 20dg52'29'E 47° 59' 3.63"N 37° 17' 21.24"E 175262 (X), 131800 (Y) 18.519474 -72.28102 view top 100 |
build_ms_gps_12_refusalmsg | build_ms_gps_12_refusalmsg | text | Type 12: BUILD_MS_GPS : Refusal Message | E3 Bureau has informed Europe & Eurasia Regional program that it does not need to provide GPS coordinates. will provide later no data Not required in award Schools and "other" (shelters) are same facilities. See GPS coordinates attached for "Multistory, Schools". view top 100 |
build_ms_dis | build_ms_dis | text | What is the closest major city or town to the project site (50k people or more)? | Belfast, Northern Ireland (United Kingdom) Londonderry / Derry, Northern Ireland (United Kingdom) -10141 Pristina Amman view top 100 |
wastewater_fac_item | wastewater_fac_item | number | Does this sub-award include any wastewater treatment facilities? (0: No, 1: Yes) | -8 0 1 -6 view top 100 |
wastewater_fac_type | wastewater_fac_type | number | For Wastewater Treatment facilities, please select all that apply and provide as | -8 -6 view top 100 |
wastewater_fac_type_1 | wastewater_fac_type_1 | number | WASTEWATER_FAC_TYPE_1 | -8 1 view top 100 |
wastewater_fac_const_loc_1 | wastewater_fac_const_loc | number | WASTEWATER_FAC_TYPE-RC Construction location (1: New site no previous construction of any kind, 2: New site with previous construction of any type, 3: Upgrade Expansion of existing facility, 4: Rehab of existing facility approximately same footprint) | -8 1 2 4 3 view top 100 |
wastewater_fac_conflict_1 | wastewater_fac_conflict_1 | number | WASTEWATER_FAC_TYPE-RC Was Is construction in a conflict area? (0: No, 1: Yes, 96: Don t Know) | -8 0 1 -6 -1 view top 100 |
wastewater_fac_plan_sites_1 | wastewater_fac_plan_sites | number | WASTEWATER_FAC_TYPE-RC Planned of sites (by location) | -8 -6 view top 100 |
wastewater_fac_plan_sites_1_1 | wastewater_fac_plan_sites_1 | number | Urban: | -8 1 view top 100 |
wastewater_fac_plan_sites_1_1_oe | wastewater_fac_plan_sites_2 | number | WASTEWATER_FAC_PLAN_SITES_1_1_OE | -8 1 4 156 300 view top 100 |
wastewater_fac_plan_sites_1_2 | wastewater_fac_plan_sites_3 | number | Rural: | -8 1 view top 100 |
wastewater_fac_plan_sites_1_2_oe | wastewater_fac_plan_sites_4 | number | WASTEWATER_FAC_PLAN_SITES_1_2_OE | -8 1 2 50 120 view top 100 |
wastewater_fac_plan_sites_1_96 | wastewater_fac_plan_sites_5 | number | Don t know | -8 1 view top 100 |
wastewater_fac_act_sites_1 | wastewater_fac_act_sites | number | WASTEWATER_FAC_TYPE-RC Actual of sites (by location) | -8 -6 view top 100 |
wastewater_fac_act_sites_1_1 | wastewater_fac_act_sites_1 | number | Urban: | -8 1 view top 100 |
wastewater_fac_act_sites_1_1_oe | wastewater_fac_act_sites_2 | number | WASTEWATER_FAC_ACT_SITES_1_1_OE | -8 1 4 156 330 view top 100 |
wastewater_fac_act_sites_1_2 | wastewater_fac_act_sites_3 | number | Rural: | -8 1 view top 100 |
wastewater_fac_act_sites_1_2_oe | wastewater_fac_act_sites_4 | number | WASTEWATER_FAC_ACT_SITES_1_2_OE | -8 1 2 9 8 view top 100 |
wastewater_fac_act_sites_1_96 | wastewater_fac_act_sites_5 | number | Don t know | -8 1 view top 100 |
wastewater_fac_plan_pop_1 | wastewater_fac_plan_pop_1 | number | WASTEWATER_FAC_TYPE-RC Planned population served (by location) | -8 -6 view top 100 |
wastewater_fac_plan_pop_1_1 | wastewater_fac_plan_pop_1_1 | number | Urban: | -8 1 view top 100 |
wastewater_fac_plan_pop_1_1_oe | wastewater_fac_plan_pop_1_2 | text | WASTEWATER_FAC_PLAN_POP_1_1_OE | 20000.0 200000.0 26.0 26500.0 30.0 view top 100 |
wastewater_fac_plan_pop_1_2 | wastewater_fac_plan_pop_1_3 | number | Rural: | -8 1 view top 100 |
wastewater_fac_plan_pop_1_2_oe | wastewater_fac_plan_pop_1_4 | number | WASTEWATER_FAC_PLAN_POP_1_2_OE | -8 26500 150 4500 50000 view top 100 |
wastewater_fac_plan_pop_1_96 | wastewater_fac_plan_pop_1_5 | number | Don t know | -8 1 view top 100 |
wastewater_fac_act_pop_1 | wastewater_fac_act_pop_1 | number | WASTEWATER_FAC_TYPE-RC Actual Estimated population served (by location) | -8 -6 view top 100 |
wastewater_fac_act_pop_1_1 | wastewater_fac_act_pop_1_1 | number | Urban: | -8 1 view top 100 |
wastewater_fac_act_pop_1_1_oe | wastewater_fac_act_pop_1_2 | number | WASTEWATER_FAC_ACT_POP_1_1_OE | -8 26 30 50 780 view top 100 |
wastewater_fac_act_pop_1_2 | wastewater_fac_act_pop_1_3 | number | Rural: | -8 1 view top 100 |
wastewater_fac_act_pop_1_2_oe | wastewater_fac_act_pop_1_4 | number | WASTEWATER_FAC_ACT_POP_1_2_OE | -8 26500 150 42000 500 view top 100 |
wastewater_fac_act_pop_1_96 | wastewater_fac_act_pop_1_5 | number | Don t know | -8 1 view top 100 |
wastewater_fac_treat_1 | wastewater_fac_treat_1 | number | WASTEWATER_FAC_TYPE-RC Level of treatment (1: Primary, 2: Secondary, 3: Tertiary) | -8 1 2 3 -6 view top 100 |
wastewater_fac_disinfect_1 | wastewater_fac_disinfect | number | WASTEWATER_FAC_TYPE-RC Disinfection system (1: Chlorination nbsp;, 2: UV, 3: Other, specify:) | -8 3 1 2 -6 view top 100 |
wastewater_fac_disinfect_1_oe | wastewater_fac_disinfect_1 | text | WASTEWATER_FAC_DISINFECT_1_OE | septic Don't don't know Don't Know Eco view top 100 |
wastewater_fac_plan_cap_1 | wastewater_fac_plan_cap_1 | number | WASTEWATER_FAC_TYPE-RC Planned typical capacity (liters day by location) | -8 -6 view top 100 |
wastewater_fac_plan_cap_1_1 | wastewater_fac_plan_cap_1_1 | number | Urban: | -8 1 view top 100 |
wastewater_fac_plan_cap_1_1_oe | wastewater_fac_plan_cap_1_2 | text | WASTEWATER_FAC_PLAN_CAP_1_1_OE | 10.0 45.0 4800000.0 6550000.0 view top 100 |
wastewater_fac_plan_cap_1_2 | wastewater_fac_plan_cap_1_3 | number | Rural: | -8 1 view top 100 |
wastewater_fac_plan_cap_1_2_oe | wastewater_fac_plan_cap_1_4 | number | WASTEWATER_FAC_PLAN_CAP_1_2_OE | 5000000.0 750.0 65000.0 66.0 1200000.0 view top 100 |
wastewater_fac_plan_cap_1_96 | wastewater_fac_plan_cap_1_5 | number | Don t know | -8 1 view top 100 |
wastewater_fac_act_cap_1 | wastewater_fac_act_cap_1 | number | WASTEWATER_FAC_TYPE-RC Actual typical capacity (liters day, by location) | -8 -6 view top 100 |
wastewater_fac_act_cap_1_1 | wastewater_fac_act_cap_1_1 | number | Urban: | -8 1 view top 100 |
wastewater_fac_act_cap_1_1_oe | wastewater_fac_act_cap_1_2 | text | WASTEWATER_FAC_ACT_CAP_1_1_OE | 10.0 45.0 6550000.0 view top 100 |
wastewater_fac_act_cap_1_2 | wastewater_fac_act_cap_1_3 | number | Rural: | -8 1 view top 100 |
wastewater_fac_act_cap_1_2_oe | wastewater_fac_act_cap_1_4 | number | WASTEWATER_FAC_ACT_CAP_1_2_OE | 5000000 750 65000 184320 0 view top 100 |
wastewater_fac_act_cap_1_96 | wastewater_fac_act_cap_1_5 | number | Don t know | -8 1 view top 100 |
wastewater_fac_plan_life_1 | wastewater_fac_plan_life | number | What is the planned designed economic life of the constructed facility (years) (-1: Don t know, 1: Years) | -8 1 -1 -6 view top 100 |
wastewater_fac_plan_life_1_oe | wastewater_fac_plan_life_1 | number | WASTEWATER_FAC_PLAN_LIFE_1_OE | -8 20 25 10 6 view top 100 |
wastewater_fac_econ_life_1 | wastewater_fac_econ_life | number | WASTEWATER_FAC_TYPE-RC Estimated economic life of the constructed facility ( (-1: Don t know, 1: Years) | -8 1 -1 -6 view top 100 |
wastewater_fac_econ_life_1_oe | wastewater_fac_econ_life_1 | number | WASTEWATER_FAC_ECON_LIFE_1_OE | -8 20 25 10 6 view top 100 |
wastewater_fac_rework_1 | wastewater_fac_rework_1 | number | WASTEWATER_FAC_TYPE-RC Rework required not completed prior to award end date (1: Yes, minor defects, 2: Yes, major defects, 3: Yes, major requirements not met; estimate not usable:, 4: Yes, completely unusable, 5: No, 6: Don t know; explain:) | -8 5 6 4 -6 view top 100 |
wastewater_fac_rework_1_oe | wastewater_fac_rework_1_oe | text | WASTEWATER_FAC_REWORK_1_OE | no construction Construction in progress Award not ended no data in file view top 100 |
wastewater_fac_gps_1_file | wastewater_fac_gps_1_file | number | Type 1: WASTEWATER_FAC_GPS : File | -8 view top 100 |
wastewater_fac_gps_1_gpscoordina | wastewater_fac_gps_1 | text | Type 1: WASTEWATER_FAC_TYPE-RC GPS coordinates for all related construction | 33.545758,35.690684 18;38;07.36 N 68;41;42.27 W 18.57321; -72.30338 18.57321; -72.30338 19.690577; -72.019447 31.49173057; -7.57555379 view top 100 |
wastewater_fac_gps_1_refusalmsg | wastewater_fac_gps_1_1 | text | Type 1: WASTEWATER_FAC_GPS : Refusal Message | Do not have grid, but is located in Jacobabad city, Sindh, Pakistan Do not have the GPS coordinates don't have them on file dont know, pitayo, silvia Information not available view top 100 |
water_fac_item | water_fac_item | number | Does this sub-award include any water treatment facilities-related items? (0: No, 1: Yes) | -8 0 1 -6 view top 100 |
water_fac_type | water_fac_type | number | For Water Treatment facilities, please select all that apply and provide as much | -8 -6 view top 100 |
water_fac_type_1 | water_fac_type_1 | number | Water treatment facilities | -8 1 view top 100 |
water_fac_const_loc_1 | water_fac_const_loc_1 | number | WATER_FAC_TYPE-RC Construction location (1: New site no previous construction of any kind, 2: New site with previous construction of any type, 3: Upgrade Expansion of existing facility, 4: Rehab of existing facility approximately same footprint) | -8 1 4 2 3 view top 100 |
water_fac_conflict_1 | water_fac_conflict_1 | number | WATER_FAC_TYPE-RC Was Is construction in a conflict area? (0: No, 1: Yes, 96: Don t Know) | -8 0 1 -1 -6 view top 100 |
water_fac_plan_sites_1 | water_fac_plan_sites_1 | number | WATER_FAC_TYPE-RC Planned of sites (by location) | -8 view top 100 |
water_fac_plan_sites_1_1 | water_fac_plan_sites_1_1 | number | Urban: | -8 1 view top 100 |
water_fac_plan_sites_1_1_oe | water_fac_plan_sites_1_1_1 | number | WATER_FAC_PLAN_SITES_1_1_OE | -8 1 0 3 6 view top 100 |
water_fac_plan_sites_1_2 | water_fac_plan_sites_1_2 | number | Rural: | -8 1 view top 100 |
water_fac_plan_sites_1_2_oe | water_fac_plan_sites_1_2_1 | number | WATER_FAC_PLAN_SITES_1_2_OE | -8 1 7 2 20 view top 100 |
water_fac_plan_sites_1_96 | water_fac_plan_sites_1_96 | number | Don t know | -8 1 view top 100 |
water_fac_act_sites_1 | water_fac_act_sites_1 | number | WATER_FAC_TYPE-RC Actual Estimated of sites (by location) | -8 -6 view top 100 |
water_fac_act_sites_1_1 | water_fac_act_sites_1_1 | number | Urban: | -8 1 view top 100 |
water_fac_act_sites_1_1_oe | water_fac_act_sites_1_1_oe | number | WATER_FAC_ACT_SITES_1_1_OE | -8 1 0 3 6 view top 100 |
water_fac_act_sites_1_2 | water_fac_act_sites_1_2 | number | Rural: | -8 1 view top 100 |
water_fac_act_sites_1_2_oe | water_fac_act_sites_1_2_oe | number | WATER_FAC_ACT_SITES_1_2_OE | -8 1 3 5 50 view top 100 |
water_fac_act_sites_1_96 | water_fac_act_sites_1_96 | number | Don t know | -8 1 view top 100 |
water_fac_plan_pop_1 | water_fac_plan_pop_1 | number | WATER_FAC_TYPE-RC Planned population served(by location) | -8 -6 view top 100 |
water_fac_plan_pop_1_1 | water_fac_plan_pop_1_1 | number | Urban: | -8 1 view top 100 |
water_fac_plan_pop_1_1_oe | water_fac_plan_pop_1_1_oe | text | WATER_FAC_PLAN_POP_1_1_OE | 1500 160000 20000 200000 4000 view top 100 |
water_fac_plan_pop_1_2 | water_fac_plan_pop_1_2 | number | Rural: | -8 1 view top 100 |
water_fac_plan_pop_1_2_oe | water_fac_plan_pop_1_2_oe | text | WATER_FAC_PLAN_POP_1_2_OE | 6000 3000 139174 154667 16500 view top 100 |
water_fac_plan_pop_1_96 | water_fac_plan_pop_1_96 | number | Don t know | -8 1 view top 100 |
water_fac_act_pop_1 | water_fac_act_pop_1 | number | WATER_FAC_TYPE-RC Actual Estimated population served (by location) | -8 -6 view top 100 |
water_fac_act_pop_1_1 | water_fac_act_pop_1_1 | number | Urban: | -8 1 view top 100 |
water_fac_act_pop_1_1_oe | water_fac_act_pop_1_1_oe | text | WATER_FAC_ACT_POP_1_1_OE | 120000 2000 20000 4000 50,000 view top 100 |
water_fac_act_pop_1_2 | water_fac_act_pop_1_2 | number | Rural: | -8 1 view top 100 |
water_fac_act_pop_1_2_oe | water_fac_act_pop_1_2_oe | text | WATER_FAC_ACT_POP_1_2_OE | 6000 3000 2000 20,000 23000 view top 100 |
water_fac_act_pop_1_96 | water_fac_act_pop_1_96 | number | Don t know | -8 1 view top 100 |
water_fac_source_1 | water_fac_source_1 | number | WATER_FAC_TYPE-RC Water source (1: Shallow well (less than 10 m), 2: Deep well (over 10 m), 3: Lake reservoir, 4: Major river (requires significant treatment, 5: Small river or creek (limited treatment needed), 6: Spring, 96: Don t Know) | -8 2 -1 1 4 view top 100 |
water_fac_treat_1 | water_fac_treat_1 | number | WATER_FAC_TYPE-RC Type of treatment (Select all that apply) (-1: Don t know, 1: Flocculation and settling system, 2: Sand filtration, 3: Fluidized carbon or other carbon-based treatment system, 4: Other filtration system (i.e. membrane-type filtration), 5: Desalination (reverse osmosis), 6: Desalination (other), 7: Water softening, 8: Chlorine disinfection, 9: Ultraviolet disinfection) | -8 -6 view top 100 |
water_fac_treat_1_1 | water_fac_treat_1_1 | number | WATER_FAC_TREAT_1_1 | -8 1 view top 100 |
water_fac_treat_1_2 | water_fac_treat_1_2 | number | WATER_FAC_TREAT_1_2 | -8 1 view top 100 |
water_fac_treat_1_3 | water_fac_treat_1_3 | number | WATER_FAC_TREAT_1_3 | -8 1 view top 100 |
water_fac_treat_1_4 | water_fac_treat_1_4 | number | WATER_FAC_TREAT_1_4 | -8 1 view top 100 |
water_fac_treat_1_5 | water_fac_treat_1_5 | number | WATER_FAC_TREAT_1_5 | -8 1 view top 100 |
water_fac_treat_1_6 | water_fac_treat_1_6 | number | WATER_FAC_TREAT_1_6 | -8 view top 100 |
water_fac_treat_1_7 | water_fac_treat_1_7 | number | WATER_FAC_TREAT_1_7 | -8 1 view top 100 |
water_fac_treat_1_8 | water_fac_treat_1_8 | number | WATER_FAC_TREAT_1_8 | -8 1 view top 100 |
water_fac_treat_1_9 | water_fac_treat_1_9 | number | WATER_FAC_TREAT_1_9 | -8 1 view top 100 |
water_fac_treat_1_96 | water_fac_treat_1_96 | number | WATER_FAC_TREAT_1_96 | -8 1 view top 100 |
water_fac_plan_cap_1 | water_fac_plan_cap_1 | number | WATER_FAC_TYPE-RC Planned typical capacity (liters day) | -8 -6 view top 100 |
water_fac_plan_cap_1_1 | water_fac_plan_cap_1_1 | number | Urban: | -8 1 view top 100 |
water_fac_plan_cap_1_1_oe | water_fac_plan_cap_1_1_oe | text | WATER_FAC_PLAN_CAP_1_1_OE | 22880 45000000 6000000 7000000 900,000 view top 100 |
water_fac_plan_cap_1_2 | water_fac_plan_cap_1_2 | number | Rural: | -8 1 view top 100 |
water_fac_plan_cap_1_2_oe | water_fac_plan_cap_1_2_oe | text | WATER_FAC_PLAN_CAP_1_2_OE | 100.0 1080000.0 13500.0 17280000.0 200.0 view top 100 |
water_fac_plan_cap_1_96 | water_fac_plan_cap_1_96 | number | Don t know | -8 1 view top 100 |
water_fac_act_cap_1 | water_fac_act_cap_1 | number | WATER_FAC_TYPE-RC Actual typical capacity (liters day) | -8 -6 view top 100 |
water_fac_act_cap_1_1 | water_fac_act_cap_1_1 | number | Urban: | -8 1 view top 100 |
water_fac_act_cap_1_1_oe | water_fac_act_cap_1_1_oe | text | WATER_FAC_ACT_CAP_1_1_OE | 22880 6000000 7000000 900,000 view top 100 |
water_fac_act_cap_1_2 | water_fac_act_cap_1_2 | number | Rural: | -8 1 view top 100 |
water_fac_act_cap_1_2_oe | water_fac_act_cap_1_2_oe | text | WATER_FAC_ACT_CAP_1_2_OE | 100.0 1080000.0 13500.0 15000.0 17280000.0 view top 100 |
water_fac_act_cap_1_96 | water_fac_act_cap_1_96 | number | Don t know | -8 1 view top 100 |
water_fac_plan_life_1 | water_fac_plan_life_1 | number | WATER_FAC_TYPE-RC What is the planned designed economic life of the constru (-1: Don t know, 1: Years) | -8 -1 1 -6 view top 100 |
water_fac_plan_life_1_oe | water_fac_plan_life_1_oe | text | WATER_FAC_PLAN_LIFE_1_OE | 35.0 40.0 10.0 20.0 5.0 view top 100 |
water_fac_econ_life_1 | water_fac_econ_life_1 | number | WATER_FAC_TYPE-RC Estimated economic life of the constructed facility (years (-1: Don t know, 1: Years) | -8 -1 1 -6 view top 100 |
water_fac_econ_life_1_oe | water_fac_econ_life_1_oe | text | WATER_FAC_ECON_LIFE_1_OE | 35.0 40.0 10.0 20.0 5.0 view top 100 |
water_fac_rework_1 | water_fac_rework_1 | number | WATER_FAC_TYPE-RC Rework required not completed prior to award end date (1: Yes, minor defects, 2: Yes, major defects, 3: Yes, major requirements not met; estimate not usable:, 4: Yes, completely unusable, 5: No, 6: Don t know; explain:) | -8 5 6 1 3 view top 100 |
water_fac_rework_1_oe | water_fac_rework_1_oe | text | WATER_FAC_REWORK_1_OE | no data on file information not provided in documentation Construction Ongoing data not available no view top 100 |
water_fac_gps_1_file | water_fac_gps_1_file | number | Type 1: WATER_FAC_GPS : File | -8 view top 100 |
water_fac_gps_1_gpscoordinates | water_fac_gps_1_gpscoordinates | text | Type 1: WATER_FAC_TYPE-RC GPS coordinates for all related construction struc | no data 32.681252°; -5.303523° 32.682613°; -5.304560° 42DG37'21"N 23DG53'35"E 6.65893;-1.556653 view top 100 |
water_fac_gps_1_refusalmsg | water_fac_gps_1_refusalmsg | text | Type 1: WATER_FAC_GPS : Refusal Message | no data Information not provided nor in files. Don't Know not Available Not Available view top 100 |
wastewater_net_item | wastewater_net_item | number | Does this sub-award include any wastewater collection networks? (0: No, 1: Yes) | -8 0 1 -6 view top 100 |