USAID Construction Assessment, Subawards: Section 10

data.usaid.gov | Last Updated 28 Apr 2022

In the process of migrating data to the current DDL platform, datasets with a large number of variables required splitting into multiple spreadsheets. They should be reassembled by the user to understand the data fully. This is the tenth spreadsheet of thirteenin the USAID Construction Assessment, Subawards. The USAID construction assessment is a survey of the character, scope, value and management of construction activities supported by USAID during the period from June 1, 2011 to June 20, 2013.

Tags: usaid, construction, georgia

This dataset has the following 351 columns:

Column NameAPI Column NameData TypeDescriptionSample Values
regionregiontext
wastemgmt_rework_4wastemgmt_rework_4numberWASTEMGMT_TYPE-RC Rework required not completed prior to award end date
wastemgmt_rework_4_oewastemgmt_rework_4_oetextWASTEMGMT_REWORK_4_OE
wastemgmt_gps_4_filewastemgmt_gps_4_filenumberType 4: WASTEMGMT_GPS : File
wastemgmt_gps_4_gpscoordinateswastemgmt_gps_4_gpscoordinatestextType 4: WASTEMGMT_TYPE-RC GPS coordinates for all related construction struc
wastemgmt_gps_4_refusalmsgwastemgmt_gps_4_refusalmsgtextType 4: WASTEMGMT_GPS : Refusal Message
wastemgmt_const_location_5wastemgmt_const_locationnumberWASTEMGMT_TYPE-RC Construction location
wastemgmt_conflict_5wastemgmt_conflict_5numberWASTEMGMT_TYPE-RC Was Is construction in a conflict area?
wastemgmt_plan_sites_5wastemgmt_plan_sites_5numberWASTEMGMT_TYPE-RC Planned of sites (by location)
wastemgmt_plan_sites_5_1wastemgmt_plan_sites_5_1numberUrban:
wastemgmt_plan_sites_5_1_oewastemgmt_plan_sites_5_1_1numberWASTEMGMT_PLAN_SITES_5_1_OE
wastemgmt_plan_sites_5_2wastemgmt_plan_sites_5_2numberRural:
wastemgmt_plan_sites_5_2_oewastemgmt_plan_sites_5_2_1numberWASTEMGMT_PLAN_SITES_5_2_OE
wastemgmt_plan_sites_5_96wastemgmt_plan_sites_5_96numberDon t know
wastemgmt_act_sites_5wastemgmt_act_sites_5numberWASTEMGMT_TYPE-RC Actual Estimated of sites (by location)
wastemgmt_act_sites_5_1wastemgmt_act_sites_5_1numberUrban:
wastemgmt_act_sites_5_1_oewastemgmt_act_sites_5_1_oenumberWASTEMGMT_ACT_SITES_5_1_OE
wastemgmt_act_sites_5_2wastemgmt_act_sites_5_2numberRural:
wastemgmt_act_sites_5_2_oewastemgmt_act_sites_5_2_oenumberWASTEMGMT_ACT_SITES_5_2_OE
wastemgmt_act_sites_5_96wastemgmt_act_sites_5_96numberDon t know
wastemgmt_waste_type_5wastemgmt_waste_type_5numberWASTEMGMT_TYPE-RC Waste types (Select all that apply)
wastemgmt_waste_type_5_1wastemgmt_waste_type_5_1numberHousehold
wastemgmt_waste_type_5_3wastemgmt_waste_type_5_3numberMunicipal (combined commercial and residential)
wastemgmt_waste_type_5_2wastemgmt_waste_type_5_2numberIndustrial
wastemgmt_waste_type_5_4wastemgmt_waste_type_5_4numberHazardous
wastemgmt_waste_type_5_96wastemgmt_waste_type_5_96numberDon t know
wastemgmt_plan_cap_5wastemgmt_plan_cap_5numberWASTEMGMT_TYPE-RC Planned capacity (tons day, by location)
wastemgmt_plan_cap_5_1wastemgmt_plan_cap_5_1numberUrban:
wastemgmt_plan_cap_5_1_oewastemgmt_plan_cap_5_1_oenumberWASTEMGMT_PLAN_CAP_5_1_OE
wastemgmt_plan_cap_5_2wastemgmt_plan_cap_5_2numberRural:
wastemgmt_plan_cap_5_2_oewastemgmt_plan_cap_5_2_oenumberWASTEMGMT_PLAN_CAP_5_2_OE
wastemgmt_plan_cap_5_96wastemgmt_plan_cap_5_96numberDon t know
wastemgmt_act_cap_5wastemgmt_act_cap_5numberWASTEMGMT_TYPE-RC Actual Estimated capacity (tons day, by location)
wastemgmt_act_cap_5_1wastemgmt_act_cap_5_1numberUrban:
wastemgmt_act_cap_5_1_oewastemgmt_act_cap_5_1_oenumberWASTEMGMT_ACT_CAP_5_1_OE
wastemgmt_act_cap_5_2wastemgmt_act_cap_5_2numberRural:
wastemgmt_act_cap_5_2_oewastemgmt_act_cap_5_2_oenumberWASTEMGMT_ACT_CAP_5_2_OE
wastemgmt_act_cap_5_96wastemgmt_act_cap_5_96numberDon t know
wastemgmt_plan_life_5wastemgmt_plan_life_5numberWASTEMGMT_TYPE-RC Planned designed economic life of the constructed facilit
wastemgmt_plan_life_5_oewastemgmt_plan_life_5_oenumberWASTEMGMT_PLAN_LIFE_5_OE
wastemgmt_econ_life_5wastemgmt_econ_life_5numberWASTEMGMT_TYPE-RC Estimated economic life of the constructed facility (years
wastemgmt_econ_life_5_oewastemgmt_econ_life_5_oenumberWASTEMGMT_ECON_LIFE_5_OE
wastemgmt_rework_5wastemgmt_rework_5numberWASTEMGMT_TYPE-RC Rework required not completed prior to award end date
wastemgmt_rework_5_oewastemgmt_rework_5_oetextWASTEMGMT_REWORK_5_OE
wastemgmt_gps_5_filewastemgmt_gps_5_filenumberType 5: WASTEMGMT_GPS : File
wastemgmt_gps_5_gpscoordinateswastemgmt_gps_5_gpscoordinatesnumberType 5: WASTEMGMT_TYPE-RC GPS coordinates for all related construction struc
wastemgmt_gps_5_refusalmsgwastemgmt_gps_5_refusalmsgtextType 5: WASTEMGMT_GPS : Refusal Message
waterres_dam_itemwaterres_dam_itemnumberDoes this sub-award include any dam-related items (including hydroelectric dams) (0: No, 1: Yes)
waterres_dam_typewaterres_dam_typenumberFor dams, please select all that apply and provide as much information as possib
waterres_dam_type_1waterres_dam_type_1numberConcrete Arch Dam or Gravity-type Dam
waterres_dam_type_2waterres_dam_type_2numberBarrage
waterres_dam_type_3waterres_dam_type_3numberRock-fill (embankment-type) Dam
waterres_dam_type_4waterres_dam_type_4numberConcrete-face rock-fill (embankment-type) dam
waterres_dam_type_5waterres_dam_type_5numberEarth-fill (embankment-type) dam
waterres_dam_type_6waterres_dam_type_6numberAsphalt-concrete core (embankment-type) dam
waterres_dam_const_location_1waterres_dam_const_locationnumberWATERRES_DAM_TYPE-RC Construction location (1: New site no previous construction of any kind, 2: New on site with previous construction of any type, 3: Upgrade Expansion of existing facility, 4: Rehab of existing facility approximately same footprint)
waterres_dam_conflict_1waterres_dam_conflict_1numberWATERRES_DAM_TYPE-RC Was Is construction in a conflict area? (-1: Don t Know, 0: No, 1: Yes)
waterres_dam_location_1waterres_dam_location_1numberWATERRES_DAM_TYPE-RC Location (1: Urban, 2: Rural)
waterres_dam_const_mat_1waterres_dam_const_mat_1numberWATERRES_DAM_TYPE-RC Dam construction material (-1: Don t know, 1: Earth Rock, 2: Concrete, 3: Both, 4: Other:)
waterres_dam_const_mat_1_oewaterres_dam_const_mat_1_1numberWATERRES_DAM_CONST_MAT_1_OE
waterres_dam_plan_sites_1waterres_dam_plan_sites_1numberWATERRES_DAM_TYPE-RC Planned of sites
waterres_dam_plan_sites_1_1waterres_dam_plan_sites_1_1number
waterres_dam_plan_sites_1_1_oewaterres_dam_plan_sites_1_2numberWATERRES_DAM_PLAN_SITES_1_1_OE
waterres_dam_plan_sites_1_96waterres_dam_plan_sites_1_3numberDon t know
waterres_dam_act_sites_1waterres_dam_act_sites_1numberWATERRES_DAM_TYPE-RC Actual Estimated of sites
waterres_dam_act_sites_1_1waterres_dam_act_sites_1_1number
waterres_dam_act_sites_1_1_oewaterres_dam_act_sites_1_2numberWATERRES_DAM_ACT_SITES_1_1_OE
waterres_dam_act_sites_1_96waterres_dam_act_sites_1_3numberDon t know
waterres_dam_height_1waterres_dam_height_1numberWATERRES_DAM_TYPE-RC Typical dam height (m) (-1: Don t know, 1: m)
waterres_dam_height_1_oewaterres_dam_height_1_oenumberWATERRES_DAM_HEIGHT_1_OE
waterres_dam_width_1waterres_dam_width_1numberWATERRES_DAM_TYPE-RC Typical dam width (m) (-1: Don t know, 1: m)
waterres_dam_width_1_oewaterres_dam_width_1_oenumberWATERRES_DAM_WIDTH_1_OE
waterres_dam_plan_vol_1waterres_dam_plan_vol_1numberWATERRES_DAM_TYPE-RC Planned typical reservoir volume (m3) (-1: Don t know, 1: m)
waterres_dam_plan_vol_1_oewaterres_dam_plan_vol_1_oenumberWATERRES_DAM_PLAN_VOL_1_OE
waterres_dam_act_vol_1waterres_dam_act_vol_1numberWATERRES_DAM_TYPE-RC Actual typical reservoir volume (m) (-1: Don t know, 1: m)
waterres_dam_act_vol_1_oewaterres_dam_act_vol_1_oenumberWATERRES_DAM_ACT_VOL_1_OE
waterres_dam_hydroelec_1waterres_dam_hydroelec_1numberWATERRES_DAM_TYPE-RC Does this Dam include Hydroelectric generation? (-1: Don t Know, 0: No, 1: Yes)
waterres_dam_plan_pop_1waterres_dam_plan_pop_1numberWATERRES_DAM_TYPE-RC Planned Population served
waterres_dam_plan_pop_1_1waterres_dam_plan_pop_1_1numberpop.
waterres_dam_plan_pop_1_1_oewaterres_dam_plan_pop_1_1_1numberWATERRES_DAM_PLAN_POP_1_1_OE
waterres_dam_plan_pop_1_96waterres_dam_plan_pop_1_96numberDon t know
waterres_dam_act_pop_1waterres_dam_act_pop_1numberWATERRES_DAM_TYPE-RC Actual Population served
waterres_dam_act_pop_1_1waterres_dam_act_pop_1_1numberpop.
waterres_dam_act_pop_1_1_oewaterres_dam_act_pop_1_1_1numberWATERRES_DAM_ACT_POP_1_1_OE
waterres_dam_act_pop_1_96waterres_dam_act_pop_1_96numberDon t know
waterres_dam_plan_mwgen_1waterres_dam_plan_mwgen_1numberWATERRES_DAM_TYPE-RC Planned typical megawatt generation (-1: Don t know, 1: MW)
waterres_dam_plan_mwgen_1_oewaterres_dam_plan_mwgen_1_1numberWATERRES_DAM_PLAN_MWGEN_1_OE
waterres_dam_act_mwgen_1waterres_dam_act_mwgen_1numberWATERRES_DAM_TYPE-RC Actual typical megawatt generation (-1: Don t know, 1: MW)
waterres_dam_act_mwgen_1_oewaterres_dam_act_mwgen_1_1numberWATERRES_DAM_ACT_MWGEN_1_OE
waterres_dam_plan_life_1waterres_dam_plan_life_1numberWATERRES_DAM_TYPE-RC Planned designed economic life of the constructed faci (-1: Don t know, 1: Years)
waterres_dam_plan_life_1_oewaterres_dam_plan_life_1_1numberWATERRES_DAM_PLAN_LIFE_1_OE
waterres_dam_est_life_1waterres_dam_est_life_1numberWATERRES_DAM_TYPE-RC Estimated economic life of the constructed facility (ye (-1: Don t know, 1: Years)
waterres_dam_est_life_1_oewaterres_dam_est_life_1_oenumberWATERRES_DAM_EST_LIFE_1_OE
waterres_dam_rework_1waterres_dam_rework_1numberWATERRES_DAM_TYPE-RC Required rework not completed prior to award end date (1: Yes, minor defects, 2: Yes, major defects, 3: Yes, major requirements not met; estimate not usable:, 4: Yes, completely unusable, 5: No, 6: Don t know; explain:)
waterres_dam_rework_1_oewaterres_dam_rework_1_oetextWATERRES_DAM_REWORK_1_OE
waterres_dam_gps_1_filewaterres_dam_gps_1_filenumberType 1: WATERRES_DAM_GPS : File
waterres_dam_gps_1_gpscoordinatewaterres_dam_gps_1numberType 1: WATERRES_DAM_TYPE-RC GPS coordinates for all related construction st
waterres_dam_gps_1_refusalmsgwaterres_dam_gps_1_refusalmsgtextType 1: WATERRES_DAM_GPS : Refusal Message
waterres_dam_const_location_2waterres_dam_const_location_1numberWATERRES_DAM_TYPE-RC Construction location (1: New site no previous construction of any kind, 2: New on site with previous construction of any type, 3: Upgrade Expansion of existing facility, 4: Rehab of existing facility approximately same footprint)
waterres_dam_conflict_2waterres_dam_conflict_2numberWATERRES_DAM_TYPE-RC Was Is construction in a conflict area? (-1: Don t Know, 0: No, 1: Yes)
waterres_dam_location_2waterres_dam_location_2numberWATERRES_DAM_TYPE-RC Location (1: Urban, 2: Rural)
waterres_dam_const_mat_2waterres_dam_const_mat_2numberWATERRES_DAM_TYPE-RC Dam construction material (-1: Don t know, 1: Earth Rock, 2: Concrete, 3: Both, 4: Other:)
waterres_dam_const_mat_2_oewaterres_dam_const_mat_2_1numberWATERRES_DAM_CONST_MAT_2_OE
waterres_dam_plan_sites_2waterres_dam_plan_sites_2numberWATERRES_DAM_TYPE-RC Planned of sites
waterres_dam_plan_sites_2_1waterres_dam_plan_sites_2_1number
waterres_dam_plan_sites_2_1_oewaterres_dam_plan_sites_2_2numberWATERRES_DAM_PLAN_SITES_2_1_OE
waterres_dam_plan_sites_2_96waterres_dam_plan_sites_2_3numberDon t know
waterres_dam_act_sites_2waterres_dam_act_sites_2numberWATERRES_DAM_TYPE-RC Actual Estimated of sites
waterres_dam_act_sites_2_1waterres_dam_act_sites_2_1number
waterres_dam_act_sites_2_1_oewaterres_dam_act_sites_2_2numberWATERRES_DAM_ACT_SITES_2_1_OE
waterres_dam_act_sites_2_96waterres_dam_act_sites_2_3numberDon t know
waterres_dam_height_2waterres_dam_height_2numberWATERRES_DAM_TYPE-RC Typical dam height (m) (-1: Don t know, 1: m)
waterres_dam_height_2_oewaterres_dam_height_2_oenumberWATERRES_DAM_HEIGHT_2_OE
waterres_dam_width_2waterres_dam_width_2numberWATERRES_DAM_TYPE-RC Typical dam width (m) (-1: Don t know, 1: m)
waterres_dam_width_2_oewaterres_dam_width_2_oenumberWATERRES_DAM_WIDTH_2_OE
waterres_dam_plan_vol_2waterres_dam_plan_vol_2numberWATERRES_DAM_TYPE-RC Planned typical reservoir volume (m3) (-1: Don t know, 1: m)
waterres_dam_plan_vol_2_oewaterres_dam_plan_vol_2_oenumberWATERRES_DAM_PLAN_VOL_2_OE
waterres_dam_act_vol_2waterres_dam_act_vol_2numberWATERRES_DAM_TYPE-RC Actual typical reservoir volume (m) (-1: Don t know, 1: m)
waterres_dam_act_vol_2_oewaterres_dam_act_vol_2_oenumberWATERRES_DAM_ACT_VOL_2_OE
waterres_dam_hydroelec_2waterres_dam_hydroelec_2numberWATERRES_DAM_TYPE-RC Does this Dam include Hydroelectric generation? (-1: Don t Know, 0: No, 1: Yes)
waterres_dam_plan_pop_2waterres_dam_plan_pop_2numberWATERRES_DAM_TYPE-RC Planned Population served
waterres_dam_plan_pop_2_1waterres_dam_plan_pop_2_1numberpop.
waterres_dam_plan_pop_2_1_oewaterres_dam_plan_pop_2_1_1numberWATERRES_DAM_PLAN_POP_2_1_OE
waterres_dam_plan_pop_2_96waterres_dam_plan_pop_2_96numberDon t know
waterres_dam_act_pop_2waterres_dam_act_pop_2numberWATERRES_DAM_TYPE-RC Actual Population served
waterres_dam_act_pop_2_1waterres_dam_act_pop_2_1numberpop.
waterres_dam_act_pop_2_1_oewaterres_dam_act_pop_2_1_1numberWATERRES_DAM_ACT_POP_2_1_OE
waterres_dam_act_pop_2_96waterres_dam_act_pop_2_96numberDon t know
waterres_dam_plan_mwgen_2waterres_dam_plan_mwgen_2numberWATERRES_DAM_TYPE-RC Planned typical megawatt generation (-1: Don t know, 1: MW)
waterres_dam_plan_mwgen_2_oewaterres_dam_plan_mwgen_2_1numberWATERRES_DAM_PLAN_MWGEN_2_OE
waterres_dam_act_mwgen_2waterres_dam_act_mwgen_2numberWATERRES_DAM_TYPE-RC Actual typical megawatt generation (-1: Don t know, 1: MW)
waterres_dam_act_mwgen_2_oewaterres_dam_act_mwgen_2_1numberWATERRES_DAM_ACT_MWGEN_2_OE
waterres_dam_plan_life_2waterres_dam_plan_life_2numberWATERRES_DAM_TYPE-RC Planned designed economic life of the constructed faci (-1: Don t know, 1: Years)
waterres_dam_plan_life_2_oewaterres_dam_plan_life_2_1numberWATERRES_DAM_PLAN_LIFE_2_OE
waterres_dam_est_life_2waterres_dam_est_life_2numberWATERRES_DAM_TYPE-RC Estimated economic life of the constructed facility (ye (-1: Don t know, 1: Years)
waterres_dam_est_life_2_oewaterres_dam_est_life_2_oenumberWATERRES_DAM_EST_LIFE_2_OE
waterres_dam_rework_2waterres_dam_rework_2numberWATERRES_DAM_TYPE-RC Required rework not completed prior to award end date (1: Yes, minor defects, 2: Yes, major defects, 3: Yes, major requirements not met; estimate not usable:, 4: Yes, completely unusable, 5: No, 6: Don t know; explain:)
waterres_dam_rework_2_oewaterres_dam_rework_2_oenumberWATERRES_DAM_REWORK_2_OE
waterres_dam_gps_2_filewaterres_dam_gps_2_filenumberType 2: WATERRES_DAM_GPS : File
waterres_dam_gps_2_gpscoordinatewaterres_dam_gps_2numberType 2: WATERRES_DAM_TYPE-RC GPS coordinates for all related construction st
waterres_dam_gps_2_refusalmsgwaterres_dam_gps_2_refusalmsgnumberType 2: WATERRES_DAM_GPS : Refusal Message
waterres_dam_const_location_3waterres_dam_const_location_2numberWATERRES_DAM_TYPE-RC Construction location (1: New site no previous construction of any kind, 2: New on site with previous construction of any type, 3: Upgrade Expansion of existing facility, 4: Rehab of existing facility approximately same footprint)
waterres_dam_conflict_3waterres_dam_conflict_3numberWATERRES_DAM_TYPE-RC Was Is construction in a conflict area? (-1: Don t Know, 0: No, 1: Yes)
waterres_dam_location_3waterres_dam_location_3numberWATERRES_DAM_TYPE-RC Location (1: Urban, 2: Rural)
waterres_dam_const_mat_3waterres_dam_const_mat_3numberWATERRES_DAM_TYPE-RC Dam construction material (-1: Don t know, 1: Earth Rock, 2: Concrete, 3: Both, 4: Other:)
waterres_dam_const_mat_3_oewaterres_dam_const_mat_3_1numberWATERRES_DAM_CONST_MAT_3_OE
waterres_dam_plan_sites_3waterres_dam_plan_sites_3numberWATERRES_DAM_TYPE-RC Planned of sites
waterres_dam_plan_sites_3_1waterres_dam_plan_sites_3_1number
waterres_dam_plan_sites_3_1_oewaterres_dam_plan_sites_3_2numberWATERRES_DAM_PLAN_SITES_3_1_OE
waterres_dam_plan_sites_3_96waterres_dam_plan_sites_3_3numberDon t know
waterres_dam_act_sites_3waterres_dam_act_sites_3numberWATERRES_DAM_TYPE-RC Actual Estimated of sites
waterres_dam_act_sites_3_1waterres_dam_act_sites_3_1number
waterres_dam_act_sites_3_1_oewaterres_dam_act_sites_3_2numberWATERRES_DAM_ACT_SITES_3_1_OE
waterres_dam_act_sites_3_96waterres_dam_act_sites_3_3numberDon t know
waterres_dam_height_3waterres_dam_height_3numberWATERRES_DAM_TYPE-RC Typical dam height (m) (-1: Don t know, 1: m)
waterres_dam_height_3_oewaterres_dam_height_3_oenumberWATERRES_DAM_HEIGHT_3_OE
waterres_dam_width_3waterres_dam_width_3numberWATERRES_DAM_TYPE-RC Typical dam width (m) (-1: Don t know, 1: m)
waterres_dam_width_3_oewaterres_dam_width_3_oenumberWATERRES_DAM_WIDTH_3_OE
waterres_dam_plan_vol_3waterres_dam_plan_vol_3numberWATERRES_DAM_TYPE-RC Planned typical reservoir volume (m3) (-1: Don t know, 1: m)
waterres_dam_plan_vol_3_oewaterres_dam_plan_vol_3_oenumberWATERRES_DAM_PLAN_VOL_3_OE
waterres_dam_act_vol_3waterres_dam_act_vol_3numberWATERRES_DAM_TYPE-RC Actual typical reservoir volume (m) (-1: Don t know, 1: m)
waterres_dam_act_vol_3_oewaterres_dam_act_vol_3_oenumberWATERRES_DAM_ACT_VOL_3_OE
waterres_dam_hydroelec_3waterres_dam_hydroelec_3numberWATERRES_DAM_TYPE-RC Does this Dam include Hydroelectric generation? (-1: Don t Know, 0: No, 1: Yes)
waterres_dam_plan_pop_3waterres_dam_plan_pop_3numberWATERRES_DAM_TYPE-RC Planned Population served
waterres_dam_plan_pop_3_1waterres_dam_plan_pop_3_1numberpop.
waterres_dam_plan_pop_3_1_oewaterres_dam_plan_pop_3_1_1numberWATERRES_DAM_PLAN_POP_3_1_OE
waterres_dam_plan_pop_3_96waterres_dam_plan_pop_3_96numberDon t know
waterres_dam_act_pop_3waterres_dam_act_pop_3numberWATERRES_DAM_TYPE-RC Actual Population served
waterres_dam_act_pop_3_1waterres_dam_act_pop_3_1numberpop.
waterres_dam_act_pop_3_1_oewaterres_dam_act_pop_3_1_1numberWATERRES_DAM_ACT_POP_3_1_OE
waterres_dam_act_pop_3_96waterres_dam_act_pop_3_96numberDon t know
waterres_dam_plan_mwgen_3waterres_dam_plan_mwgen_3numberWATERRES_DAM_TYPE-RC Planned typical megawatt generation (-1: Don t know, 1: MW)
waterres_dam_plan_mwgen_3_oewaterres_dam_plan_mwgen_3_1numberWATERRES_DAM_PLAN_MWGEN_3_OE
waterres_dam_act_mwgen_3waterres_dam_act_mwgen_3numberWATERRES_DAM_TYPE-RC Actual typical megawatt generation (-1: Don t know, 1: MW)
waterres_dam_act_mwgen_3_oewaterres_dam_act_mwgen_3_1numberWATERRES_DAM_ACT_MWGEN_3_OE
waterres_dam_plan_life_3waterres_dam_plan_life_3numberWATERRES_DAM_TYPE-RC Planned designed economic life of the constructed faci (-1: Don t know, 1: Years)
waterres_dam_plan_life_3_oewaterres_dam_plan_life_3_1numberWATERRES_DAM_PLAN_LIFE_3_OE
waterres_dam_est_life_3waterres_dam_est_life_3numberWATERRES_DAM_TYPE-RC Estimated economic life of the constructed facility (ye (-1: Don t know, 1: Years)
waterres_dam_est_life_3_oewaterres_dam_est_life_3_oenumberWATERRES_DAM_EST_LIFE_3_OE
waterres_dam_rework_3waterres_dam_rework_3numberWATERRES_DAM_TYPE-RC Required rework not completed prior to award end date (1: Yes, minor defects, 2: Yes, major defects, 3: Yes, major requirements not met; estimate not usable:, 4: Yes, completely unusable, 5: No, 6: Don t know; explain:)
waterres_dam_rework_3_oewaterres_dam_rework_3_oetextWATERRES_DAM_REWORK_3_OE
waterres_dam_gps_3_filewaterres_dam_gps_3_filetextType 3: WATERRES_DAM_GPS : File
waterres_dam_gps_3_gpscoordinatewaterres_dam_gps_3textType 3: WATERRES_DAM_TYPE-RC GPS coordinates for all related construction st
waterres_dam_gps_3_refusalmsgwaterres_dam_gps_3_refusalmsgtextType 3: WATERRES_DAM_GPS : Refusal Message
waterres_dam_const_location_4waterres_dam_const_location_3numberWATERRES_DAM_TYPE-RC Construction location (1: New site no previous construction of any kind, 2: New on site with previous construction of any type, 3: Upgrade Expansion of existing facility, 4: Rehab of existing facility approximately same footprint)
waterres_dam_conflict_4waterres_dam_conflict_4numberWATERRES_DAM_TYPE-RC Was Is construction in a conflict area? (-1: Don t Know, 0: No, 1: Yes)
waterres_dam_location_4waterres_dam_location_4numberWATERRES_DAM_TYPE-RC Location (1: Urban, 2: Rural)
waterres_dam_const_mat_4waterres_dam_const_mat_4numberWATERRES_DAM_TYPE-RC Dam construction material (-1: Don t know, 1: Earth Rock, 2: Concrete, 3: Both, 4: Other:)
waterres_dam_const_mat_4_oewaterres_dam_const_mat_4_1numberWATERRES_DAM_CONST_MAT_4_OE
waterres_dam_plan_sites_4waterres_dam_plan_sites_4numberWATERRES_DAM_TYPE-RC Planned of sites
waterres_dam_plan_sites_4_1waterres_dam_plan_sites_4_1number
waterres_dam_plan_sites_4_1_oewaterres_dam_plan_sites_4_2numberWATERRES_DAM_PLAN_SITES_4_1_OE
waterres_dam_plan_sites_4_96waterres_dam_plan_sites_4_3numberDon t know
waterres_dam_act_sites_4waterres_dam_act_sites_4numberWATERRES_DAM_TYPE-RC Actual Estimated of sites
waterres_dam_act_sites_4_1waterres_dam_act_sites_4_1number
waterres_dam_act_sites_4_1_oewaterres_dam_act_sites_4_2numberWATERRES_DAM_ACT_SITES_4_1_OE
waterres_dam_act_sites_4_96waterres_dam_act_sites_4_3numberDon t know
waterres_dam_height_4waterres_dam_height_4numberWATERRES_DAM_TYPE-RC Typical dam height (m) (-1: Don t know, 1: m)
waterres_dam_height_4_oewaterres_dam_height_4_oenumberWATERRES_DAM_HEIGHT_4_OE
waterres_dam_width_4waterres_dam_width_4numberWATERRES_DAM_TYPE-RC Typical dam width (m) (-1: Don t know, 1: m)
waterres_dam_width_4_oewaterres_dam_width_4_oenumberWATERRES_DAM_WIDTH_4_OE
waterres_dam_plan_vol_4waterres_dam_plan_vol_4numberWATERRES_DAM_TYPE-RC Planned typical reservoir volume (m3) (-1: Don t know, 1: m)
waterres_dam_plan_vol_4_oewaterres_dam_plan_vol_4_oenumberWATERRES_DAM_PLAN_VOL_4_OE
waterres_dam_act_vol_4waterres_dam_act_vol_4numberWATERRES_DAM_TYPE-RC Actual typical reservoir volume (m) (-1: Don t know, 1: m)
waterres_dam_act_vol_4_oewaterres_dam_act_vol_4_oenumberWATERRES_DAM_ACT_VOL_4_OE
waterres_dam_hydroelec_4waterres_dam_hydroelec_4numberWATERRES_DAM_TYPE-RC Does this Dam include Hydroelectric generation? (-1: Don t Know, 0: No, 1: Yes)
waterres_dam_plan_pop_4waterres_dam_plan_pop_4numberWATERRES_DAM_TYPE-RC Planned Population served
waterres_dam_plan_pop_4_1waterres_dam_plan_pop_4_1numberpop.
waterres_dam_plan_pop_4_1_oewaterres_dam_plan_pop_4_1_1numberWATERRES_DAM_PLAN_POP_4_1_OE
waterres_dam_plan_pop_4_96waterres_dam_plan_pop_4_96numberDon t know
waterres_dam_act_pop_4waterres_dam_act_pop_4numberWATERRES_DAM_TYPE-RC Actual Population served
waterres_dam_act_pop_4_1waterres_dam_act_pop_4_1numberpop.
waterres_dam_act_pop_4_1_oewaterres_dam_act_pop_4_1_1numberWATERRES_DAM_ACT_POP_4_1_OE
waterres_dam_act_pop_4_96waterres_dam_act_pop_4_96numberDon t know
waterres_dam_plan_mwgen_4waterres_dam_plan_mwgen_4numberWATERRES_DAM_TYPE-RC Planned typical megawatt generation (-1: Don t know, 1: MW)
waterres_dam_plan_mwgen_4_oewaterres_dam_plan_mwgen_4_1numberWATERRES_DAM_PLAN_MWGEN_4_OE
waterres_dam_act_mwgen_4waterres_dam_act_mwgen_4numberWATERRES_DAM_TYPE-RC Actual typical megawatt generation (-1: Don t know, 1: MW)
waterres_dam_act_mwgen_4_oewaterres_dam_act_mwgen_4_1numberWATERRES_DAM_ACT_MWGEN_4_OE
waterres_dam_plan_life_4waterres_dam_plan_life_4numberWATERRES_DAM_TYPE-RC Planned designed economic life of the constructed faci (-1: Don t know, 1: Years)
waterres_dam_plan_life_4_oewaterres_dam_plan_life_4_1numberWATERRES_DAM_PLAN_LIFE_4_OE
waterres_dam_est_life_4waterres_dam_est_life_4numberWATERRES_DAM_TYPE-RC Estimated economic life of the constructed facility (ye (-1: Don t know, 1: Years)
waterres_dam_est_life_4_oewaterres_dam_est_life_4_oenumberWATERRES_DAM_EST_LIFE_4_OE
waterres_dam_rework_4waterres_dam_rework_4numberWATERRES_DAM_TYPE-RC Required rework not completed prior to award end date (1: Yes, minor defects, 2: Yes, major defects, 3: Yes, major requirements not met; estimate not usable:, 4: Yes, completely unusable, 5: No, 6: Don t know; explain:)
waterres_dam_rework_4_oewaterres_dam_rework_4_oetextWATERRES_DAM_REWORK_4_OE
waterres_dam_gps_4_filewaterres_dam_gps_4_filenumberType 4: WATERRES_DAM_GPS : File
waterres_dam_gps_4_gpscoordinatewaterres_dam_gps_4textType 4: WATERRES_DAM_TYPE-RC GPS coordinates for all related construction st
waterres_dam_gps_4_refusalmsgwaterres_dam_gps_4_refusalmsgtextType 4: WATERRES_DAM_GPS : Refusal Message
waterres_dam_const_location_5waterres_dam_const_location_4numberWATERRES_DAM_TYPE-RC Construction location (1: New site no previous construction of any kind, 2: New on site with previous construction of any type, 3: Upgrade Expansion of existing facility, 4: Rehab of existing facility approximately same footprint)
waterres_dam_conflict_5waterres_dam_conflict_5numberWATERRES_DAM_TYPE-RC Was Is construction in a conflict area? (-1: Don t Know, 0: No, 1: Yes)
waterres_dam_location_5waterres_dam_location_5numberWATERRES_DAM_TYPE-RC Location (1: Urban, 2: Rural)
waterres_dam_const_mat_5waterres_dam_const_mat_5numberWATERRES_DAM_TYPE-RC Dam construction material (-1: Don t know, 1: Earth Rock, 2: Concrete, 3: Both, 4: Other:)
waterres_dam_const_mat_5_oewaterres_dam_const_mat_5_1textWATERRES_DAM_CONST_MAT_5_OE
waterres_dam_plan_sites_5waterres_dam_plan_sites_5numberWATERRES_DAM_TYPE-RC Planned of sites
waterres_dam_plan_sites_5_1waterres_dam_plan_sites_5_1number
waterres_dam_plan_sites_5_1_oewaterres_dam_plan_sites_5_2numberWATERRES_DAM_PLAN_SITES_5_1_OE
waterres_dam_plan_sites_5_96waterres_dam_plan_sites_5_3numberDon t know
waterres_dam_act_sites_5waterres_dam_act_sites_5numberWATERRES_DAM_TYPE-RC Actual Estimated of sites
waterres_dam_act_sites_5_1waterres_dam_act_sites_5_1number
waterres_dam_act_sites_5_1_oewaterres_dam_act_sites_5_2numberWATERRES_DAM_ACT_SITES_5_1_OE
waterres_dam_act_sites_5_96waterres_dam_act_sites_5_3numberDon t know
waterres_dam_height_5waterres_dam_height_5numberWATERRES_DAM_TYPE-RC Typical dam height (m) (-1: Don t know, 1: m)
waterres_dam_height_5_oewaterres_dam_height_5_oenumberWATERRES_DAM_HEIGHT_5_OE
waterres_dam_width_5waterres_dam_width_5numberWATERRES_DAM_TYPE-RC Typical dam width (m) (-1: Don t know, 1: m)
waterres_dam_width_5_oewaterres_dam_width_5_oenumberWATERRES_DAM_WIDTH_5_OE
waterres_dam_plan_vol_5waterres_dam_plan_vol_5numberWATERRES_DAM_TYPE-RC Planned typical reservoir volume (m3) (-1: Don t know, 1: m)
waterres_dam_plan_vol_5_oewaterres_dam_plan_vol_5_oenumberWATERRES_DAM_PLAN_VOL_5_OE
waterres_dam_act_vol_5waterres_dam_act_vol_5numberWATERRES_DAM_TYPE-RC Actual typical reservoir volume (m) (-1: Don t know, 1: m)
waterres_dam_act_vol_5_oewaterres_dam_act_vol_5_oenumberWATERRES_DAM_ACT_VOL_5_OE
waterres_dam_hydroelec_5waterres_dam_hydroelec_5numberWATERRES_DAM_TYPE-RC Does this Dam include Hydroelectric generation? (-1: Don t Know, 0: No, 1: Yes)
waterres_dam_plan_pop_5waterres_dam_plan_pop_5numberWATERRES_DAM_TYPE-RC Planned Population served
waterres_dam_plan_pop_5_1waterres_dam_plan_pop_5_1numberpop.
waterres_dam_plan_pop_5_1_oewaterres_dam_plan_pop_5_1_1numberWATERRES_DAM_PLAN_POP_5_1_OE
waterres_dam_plan_pop_5_96waterres_dam_plan_pop_5_96numberDon t know
waterres_dam_act_pop_5waterres_dam_act_pop_5numberWATERRES_DAM_TYPE-RC Actual Population served
waterres_dam_act_pop_5_1waterres_dam_act_pop_5_1numberpop.
waterres_dam_act_pop_5_1_oewaterres_dam_act_pop_5_1_1numberWATERRES_DAM_ACT_POP_5_1_OE
waterres_dam_act_pop_5_96waterres_dam_act_pop_5_96numberDon t know
waterres_dam_plan_mwgen_5waterres_dam_plan_mwgen_5numberWATERRES_DAM_TYPE-RC Planned typical megawatt generation (-1: Don t know, 1: MW)
waterres_dam_plan_mwgen_5_oewaterres_dam_plan_mwgen_5_1numberWATERRES_DAM_PLAN_MWGEN_5_OE
waterres_dam_act_mwgen_5waterres_dam_act_mwgen_5numberWATERRES_DAM_TYPE-RC Actual typical megawatt generation (-1: Don t know, 1: MW)
waterres_dam_act_mwgen_5_oewaterres_dam_act_mwgen_5_1numberWATERRES_DAM_ACT_MWGEN_5_OE
waterres_dam_plan_life_5waterres_dam_plan_life_5numberWATERRES_DAM_TYPE-RC Planned designed economic life of the constructed faci (-1: Don t know, 1: Years)
waterres_dam_plan_life_5_oewaterres_dam_plan_life_5_1numberWATERRES_DAM_PLAN_LIFE_5_OE
waterres_dam_est_life_5waterres_dam_est_life_5numberWATERRES_DAM_TYPE-RC Estimated economic life of the constructed facility (ye (-1: Don t know, 1: Years)
waterres_dam_est_life_5_oewaterres_dam_est_life_5_oenumberWATERRES_DAM_EST_LIFE_5_OE
waterres_dam_rework_5waterres_dam_rework_5numberWATERRES_DAM_TYPE-RC Required rework not completed prior to award end date (1: Yes, minor defects, 2: Yes, major defects, 3: Yes, major requirements not met; estimate not usable:, 4: Yes, completely unusable, 5: No, 6: Don t know; explain:)
waterres_dam_rework_5_oewaterres_dam_rework_5_oetextWATERRES_DAM_REWORK_5_OE
waterres_dam_gps_5_filewaterres_dam_gps_5_filetextType 5: WATERRES_DAM_GPS : File
waterres_dam_gps_5_gpscoordinatewaterres_dam_gps_5textType 5: WATERRES_DAM_TYPE-RC GPS coordinates for all related construction st
waterres_dam_gps_5_refusalmsgwaterres_dam_gps_5_refusalmsgtextType 5: WATERRES_DAM_GPS : Refusal Message
waterres_dam_const_location_6waterres_dam_const_location_5numberWATERRES_DAM_TYPE-RC Construction location (1: New site no previous construction of any kind, 2: New on site with previous construction of any type, 3: Upgrade Expansion of existing facility, 4: Rehab of existing facility approximately same footprint)
waterres_dam_conflict_6waterres_dam_conflict_6numberWATERRES_DAM_TYPE-RC Was Is construction in a conflict area? (-1: Don t Know, 0: No, 1: Yes)
waterres_dam_location_6waterres_dam_location_6numberWATERRES_DAM_TYPE-RC Location (1: Urban, 2: Rural)
waterres_dam_const_mat_6waterres_dam_const_mat_6numberWATERRES_DAM_TYPE-RC Dam construction material (-1: Don t know, 1: Earth Rock, 2: Concrete, 3: Both, 4: Other:)
waterres_dam_const_mat_6_oewaterres_dam_const_mat_6_1numberWATERRES_DAM_CONST_MAT_6_OE
waterres_dam_plan_sites_6waterres_dam_plan_sites_6numberWATERRES_DAM_TYPE-RC Planned of sites
waterres_dam_plan_sites_6_1waterres_dam_plan_sites_6_1number
waterres_dam_plan_sites_6_1_oewaterres_dam_plan_sites_6_2numberWATERRES_DAM_PLAN_SITES_6_1_OE
waterres_dam_plan_sites_6_96waterres_dam_plan_sites_6_3numberDon t know
waterres_dam_act_sites_6waterres_dam_act_sites_6numberWATERRES_DAM_TYPE-RC Actual Estimated of sites
waterres_dam_act_sites_6_1waterres_dam_act_sites_6_1number
waterres_dam_act_sites_6_1_oewaterres_dam_act_sites_6_2numberWATERRES_DAM_ACT_SITES_6_1_OE
waterres_dam_act_sites_6_96waterres_dam_act_sites_6_3numberDon t know
waterres_dam_height_6waterres_dam_height_6numberWATERRES_DAM_TYPE-RC Typical dam height (m) (-1: Don t know, 1: m)
waterres_dam_height_6_oewaterres_dam_height_6_oenumberWATERRES_DAM_HEIGHT_6_OE
waterres_dam_width_6waterres_dam_width_6numberWATERRES_DAM_TYPE-RC Typical dam width (m) (-1: Don t know, 1: m)
waterres_dam_width_6_oewaterres_dam_width_6_oenumberWATERRES_DAM_WIDTH_6_OE
waterres_dam_plan_vol_6waterres_dam_plan_vol_6numberWATERRES_DAM_TYPE-RC Planned typical reservoir volume (m3) (-1: Don t know, 1: m)
waterres_dam_plan_vol_6_oewaterres_dam_plan_vol_6_oenumberWATERRES_DAM_PLAN_VOL_6_OE
waterres_dam_act_vol_6waterres_dam_act_vol_6numberWATERRES_DAM_TYPE-RC Actual typical reservoir volume (m) (-1: Don t know, 1: m)
waterres_dam_act_vol_6_oewaterres_dam_act_vol_6_oenumberWATERRES_DAM_ACT_VOL_6_OE
waterres_dam_hydroelec_6waterres_dam_hydroelec_6numberWATERRES_DAM_TYPE-RC Does this Dam include Hydroelectric generation? (-1: Don t Know, 0: No, 1: Yes)
waterres_dam_plan_pop_6waterres_dam_plan_pop_6numberWATERRES_DAM_TYPE-RC Planned Population served
waterres_dam_plan_pop_6_1waterres_dam_plan_pop_6_1numberpop.
waterres_dam_plan_pop_6_1_oewaterres_dam_plan_pop_6_1_1numberWATERRES_DAM_PLAN_POP_6_1_OE
waterres_dam_plan_pop_6_96waterres_dam_plan_pop_6_96numberDon t know
waterres_dam_act_pop_6waterres_dam_act_pop_6numberWATERRES_DAM_TYPE-RC Actual Population served
waterres_dam_act_pop_6_1waterres_dam_act_pop_6_1numberpop.
waterres_dam_act_pop_6_1_oewaterres_dam_act_pop_6_1_1numberWATERRES_DAM_ACT_POP_6_1_OE
waterres_dam_act_pop_6_96waterres_dam_act_pop_6_96numberDon t know
waterres_dam_plan_mwgen_6waterres_dam_plan_mwgen_6numberWATERRES_DAM_TYPE-RC Planned typical megawatt generation (-1: Don t know, 1: MW)
waterres_dam_plan_mwgen_6_oewaterres_dam_plan_mwgen_6_1numberWATERRES_DAM_PLAN_MWGEN_6_OE
waterres_dam_act_mwgen_6waterres_dam_act_mwgen_6numberWATERRES_DAM_TYPE-RC Actual typical megawatt generation (-1: Don t know, 1: MW)
waterres_dam_act_mwgen_6_oewaterres_dam_act_mwgen_6_1numberWATERRES_DAM_ACT_MWGEN_6_OE
waterres_dam_plan_life_6waterres_dam_plan_life_6numberWATERRES_DAM_TYPE-RC Planned designed economic life of the constructed faci (-1: Don t know, 1: Years)
waterres_dam_plan_life_6_oewaterres_dam_plan_life_6_1numberWATERRES_DAM_PLAN_LIFE_6_OE
waterres_dam_est_life_6waterres_dam_est_life_6numberWATERRES_DAM_TYPE-RC Estimated economic life of the constructed facility (ye (-1: Don t know, 1: Years)
waterres_dam_est_life_6_oewaterres_dam_est_life_6_oenumberWATERRES_DAM_EST_LIFE_6_OE
waterres_dam_rework_6waterres_dam_rework_6numberWATERRES_DAM_TYPE-RC Required rework not completed prior to award end date (1: Yes, minor defects, 2: Yes, major defects, 3: Yes, major requirements not met; estimate not usable:, 4: Yes, completely unusable, 5: No, 6: Don t know; explain:)
waterres_dam_rework_6_oewaterres_dam_rework_6_oenumberWATERRES_DAM_REWORK_6_OE
waterres_dam_gps_6_filewaterres_dam_gps_6_filenumberType 6: WATERRES_DAM_GPS : File
waterres_dam_gps_6_gpscoordinatewaterres_dam_gps_6textType 6: WATERRES_DAM_TYPE-RC GPS coordinates for all related construction st
waterres_dam_gps_6_refusalmsgwaterres_dam_gps_6_refusalmsgtextType 6: WATERRES_DAM_GPS : Refusal Message
dams_disdams_distextWhat is the closest major city to the project site?
waterres_irri_itemwaterres_irri_itemnumberDoes this award include any irrigation systems-related items? (0: No, 1: Yes)
irri_sourceirri_sourcenumberFor Irrigation Systems, what is the source water? Select all that apply.
irri_source_1irri_source_1numberExisting impoundment
irri_source_2irri_source_2numberNew impoundment built by award
irri_source_3irri_source_3numberNatural lake
irri_source_4irri_source_4numberGroundwater
irri_source_96irri_source_96numberDon t know
irri_source_97irri_source_97numberNot applicable
irri_source_5irri_source_5numberOther, please specify:
irri_source_5_oeirri_source_5_oetextIRRI_SOURCE_5_OE
irri_typeirri_typenumberFor irrigation systems, please select all that apply and provide as much informa
irri_type_1irri_type_1numberCanals
irri_type_2irri_type_2numberPiped
irri_type_3irri_type_3numberPivot
irri_const_location_1irri_const_location_1numberIRRI_TYPE-RC Construction location (1: New site no previous construction of any kind, 2: New on site with previous construction of any type, 3: Upgrade Expansion of existing facility, 4: Rehab of existing facility approximately same footprint)
irri_conflict_1irri_conflict_1numberIRRI_TYPE-RC Was Is construction in a conflict area? (-1: Don t Know, 0: No, 1: Yes)
irri_plan_prim_length_1irri_plan_prim_length_1numberIRRI_TYPE-RC Planned primary canal length (km) (-1: Don t know, 1: km)
irri_plan_prim_length_1_oeirri_plan_prim_length_1_oenumberIRRI_PLAN_PRIM_LENGTH_1_OE
irri_plan_sec_length_1irri_plan_sec_length_1numberIRRI_TYPE-RC Planned secondary canal length (km) (-1: Don t know, 1: km)
irri_plan_sec_length_1_oeirri_plan_sec_length_1_oenumberIRRI_PLAN_SEC_LENGTH_1_OE
irri_plan_tert_length_1irri_plan_tert_length_1numberIRRI_TYPE-RC Planned tertiary canal length (km) (-1: Don t know, 1: km)
irri_plan_tert_length_1_oeirri_plan_tert_length_1_oenumberIRRI_PLAN_TERT_LENGTH_1_OE
irri_act_prim_length_1irri_act_prim_length_1numberIRRI_TYPE-RC Actual Estimated primary canal length (km) (-1: Don t know, 1: km)
irri_act_prim_length_1_oeirri_act_prim_length_1_oenumberIRRI_ACT_PRIM_LENGTH_1_OE
irri_act_sec_length_1irri_act_sec_length_1numberIRRI_TYPE-RC Actual Estimated secondary canal length (km) (-1: Don t know, 1: km)
irri_act_sec_length_1_oeirri_act_sec_length_1_oenumberIRRI_ACT_SEC_LENGTH_1_OE
irri_act_tert_length_1irri_act_tert_length_1numberIRRI_TYPE-RC Actual Estimated tertiary canal length (km) (-1: Don t know, 1: km)
irri_act_tert_length_1_oeirri_act_tert_length_1_oenumberIRRI_ACT_TERT_LENGTH_1_OE
irri_plan_irri_1irri_plan_irri_1numberIRRI_TYPE-RC Planned area irrigated (ha) (-1: Don t know, 1: ha)
irri_plan_irri_1_oeirri_plan_irri_1_oenumberIRRI_PLAN_IRRI_1_OE
irri_act_irri_1irri_act_irri_1numberIRRI_TYPE-RC Actual Estimated area irrigated (ha) (-1: Don t know, 1: ha)
irri_act_irri_1_oeirri_act_irri_1_oenumberIRRI_ACT_IRRI_1_OE
irri_plan_life_1irri_plan_life_1numberIRRI_TYPE-RC Planned designed economic life of the constructed facility (ye (-1: Don t know, 1: Years)
irri_plan_life_1_oeirri_plan_life_1_oenumberIRRI_PLAN_LIFE_1_OE
irri_est_life_1irri_est_life_1numberIRRI_TYPE-RC Estimated economic life of the constructed facility (years) (-1: Don t know, 1: Years)
irri_est_life_1_oeirri_est_life_1_oenumberIRRI_EST_LIFE_1_OE
irri_rework_1irri_rework_1numberIRRI_TYPE-RC Required rework not completed prior to award end date (1: Yes, minor defects, 2: Yes, major defects, 3: Yes, major requirements not met; estimate not usable:, 4: Yes, completely unusable, 5: No, 6: Don t know; explain:)