USAID Construction Assessment, Subawards: Section 1

data.usaid.gov | Last Updated 28 Apr 2022

This dataset contains data on subwards identified in the survey of USAID construction carried out between June 1, 2011 to June 20 to learn about the character, scope, value and management of USAID supported construction activities. In the process of migrating data to the current DDL platform, datasets with a large number of variables required splitting into multiple spreadsheets. They should be reassembled by the user to understand the data fully. The USAID construction assessment is a survey of the character, scope, value and management of construction activities supported by USAID during the period from June 1, 2011 to June 20, 2013.

Tags: usaid, construction, georgia

This dataset has the following 350 columns:

Column NameAPI Column NameData TypeDescriptionSample Values
regionregiontext
award_idaward_idnumberAward ID
subaward_idsubaward_idnumberSUBAWARD_ID
subaward_namesubaward_nametextSubaward Name
bucket_risk_catbucket_risk_cattextBucket_risk_cat
categorycategorytextCategory
construct_typeconstruct_typenumberWhat types of construction were are included in this sub-award? Please check all
construct_type_1construct_type_1numberTransportation (roads, bridges, rail beds, ports, etc.)
construct_type_2construct_type_2numberBuildings (new construction, renovation, and or repair; includes airport termina
construct_type_3construct_type_3numberWater wastewater facilities (potable water distribution, water treatment plants,
construct_type_4construct_type_4numberEnergy related facilities (carbon-based, solar and wind, electrical and natural
construct_type_5construct_type_5numberTelecommunication facilities (cell towers, antennae, switching stations)
construct_type_6construct_type_6numberSolid waste management facilities (landfills, transfer stations, recycling cente
construct_type_7construct_type_7numberWater resources facilities (dams, irrigation systems, includes hydroelectric dam
construct_type_8construct_type_8numberWater storage rainwater catchment systems (below or on-ground cisterns water cat
construct_type_9construct_type_9numberOther construction activities (non-building cultural heritage sites, market or o
roadway_itemroadway_itemnumberDoes the sub award include any roadway related items? (0: No, 1: Yes)
roadway_typeroadway_typenumberFor roadway construction under the sub-award, please select all that apply and p
roadway_type_1roadway_type_1numberConcrete, 4 or more lanes
roadway_type_2roadway_type_2numberConcrete, 2 lanes
roadway_type_3roadway_type_3numberAsphalt, 4 or more lanes
roadway_type_4roadway_type_4numberAsphalt, 2 or more lanes
roadway_type_7roadway_type_7numberOther (specify):
roadway_type_7_oeroadway_type_7_oetextROADWAY_TYPE_7_OE
roadway_type_5roadway_type_5numberGravel, 2 lanes
roadway_type_6roadway_type_6numberDirt, 2 lanes
roadway_location_1roadway_location_1numberType 1: ROADWAY_TYPE-RC Construction location (1: New site no previous construction of any kind, 2: New on site with previous construction of any type, 3: Upgrade Expansion of existing facility, 4: Rehab of existing facility approximately same footprint)
road_conflict_sub_1road_conflict_sub_1numberType 1: Was Is construction in a conflict area? (-1: Don t Know, 1: Yes, 2: No)
roadway_prefab_1roadway_prefab_1numberType 1: Did this facility include any major pre-fabricated components? (-1: Don t Know, 1: Yes, 2: No)
roadway_plan_segments_1roadway_plan_segments_1numberType 1: ROADWAY_TYPE-RC Planned number of segments (by location)
roadway_plan_segments_1_1roadway_plan_segments_1_1numberUrban
roadway_plan_segments_1_1_oeroadway_plan_segments_1_1_1numberROADWAY_PLAN_SEGMENTS_1_1_OE
roadway_plan_segments_1_2roadway_plan_segments_1_2numberRural
roadway_plan_segments_1_2_oeroadway_plan_segments_1_2_1numberROADWAY_PLAN_SEGMENTS_1_2_OE
roadway_plan_segments_1_96roadway_plan_segments_1_96numberDon t Know
roadway_actual_segments_1roadway_actual_segments_1numberType 1: ROADWAY_TYPE-RC Actual(if complete) Estimated (if ongoing) number o
roadway_actual_segments_1_1roadway_actual_segments_1_1numberUrban
roadway_actual_segments_1_1_oeroadway_actual_segments_1_2numberROADWAY_ACTUAL_SEGMENTS_1_1_OE
roadway_actual_segments_1_2roadway_actual_segments_1_3numberRural
roadway_actual_segments_1_2_oeroadway_actual_segments_1_4numberROADWAY_ACTUAL_SEGMENTS_1_2_OE
roadway_actual_segments_1_96roadway_actual_segments_1_5numberDon t Know
roadway_planned_km_1roadway_planned_km_1numberType 1:Planned total km
roadway_planned_km_1_1roadway_planned_km_1_1numberUrban
roadway_planned_km_1_1_oeroadway_planned_km_1_1_oenumberROADWAY_PLANNED_KM_1_1_OE
roadway_planned_km_1_2roadway_planned_km_1_2numberRural
roadway_planned_km_1_2_oeroadway_planned_km_1_2_oenumberROADWAY_PLANNED_KM_1_2_OE
roadway_planned_km_1_96roadway_planned_km_1_96numberDon t Know
roadway_actual_km_1roadway_actual_km_1numberType 1: Actual Estimated total km
roadway_actual_km_1_1roadway_actual_km_1_1numberUrban
roadway_actual_km_1_1_oeroadway_actual_km_1_1_oenumberROADWAY_ACTUAL_KM_1_1_OE
roadway_actual_km_1_2roadway_actual_km_1_2numberRural
roadway_actual_km_1_2_oeroadway_actual_km_1_2_oenumberROADWAY_ACTUAL_KM_1_2_OE
roadway_actual_km_1_96roadway_actual_km_1_96numberDon t know
roadway_plan_life_1roadway_plan_life_1numberType 1: Planned designed economic life of the constructed facility (-1: Don t know, 1: Years:)
roadway_plan_life_1_oeroadway_plan_life_1_oenumberROADWAY_PLAN_LIFE_1_OE
roadway_est_life_1roadway_est_life_1numberType 1: Estimated economic life of the constructed facility (-1: Don t know, 1: Years:)
roadway_est_life_1_oeroadway_est_life_1_oenumberROADWAY_EST_LIFE_1_OE
roadway_rework_req_1roadway_rework_req_1numberROADWAY_TYPE-RC Required rework not completed prior to award end date (1: Yes, minor defects, 2: Yes, major defects, 3: Yes, major requirements not met; estimate not usable: nbsp;, 4: Yes, completely unusable, 5: No, 6: Don t know; explain:)
roadway_rework_req_1_oeroadway_rework_req_1_oenumberROADWAY_REWORK_REQ_1_OE
roadway_gps_1_fileroadway_gps_1_filenumberType 1: ROADWAY_GPS : File
roadway_gps_1_gpscoordinatesroadway_gps_1_gpscoordinatesnumberType 1: ROADWAY_TYPE-RC GPS coordinates for all related construction structures
roadway_gps_1_refusalmsgroadway_gps_1_refusalmsgnumberType 1: ROADWAY_GPS : Refusal Message
roadway_location_2roadway_location_2numberType 2: ROADWAY_TYPE-RC Construction location (1: New site no previous construction of any kind, 2: New on site with previous construction of any type, 3: Upgrade Expansion of existing facility, 4: Rehab of existing facility approximately same footprint)
road_conflict_sub_2road_conflict_sub_2numberType 2: Was Is construction in a conflict area? (-1: Don t Know, 1: Yes, 2: No)
roadway_prefab_2roadway_prefab_2numberType 2: Did this facility include any major pre-fabricated components? (-1: Don t Know, 1: Yes, 2: No)
roadway_plan_segments_2roadway_plan_segments_2numberType 2: ROADWAY_TYPE-RC Planned number of segments (by location)
roadway_plan_segments_2_1roadway_plan_segments_2_1numberUrban
roadway_plan_segments_2_1_oeroadway_plan_segments_2_1_1numberROADWAY_PLAN_SEGMENTS_2_1_OE
roadway_plan_segments_2_2roadway_plan_segments_2_2numberRural
roadway_plan_segments_2_2_oeroadway_plan_segments_2_2_1numberROADWAY_PLAN_SEGMENTS_2_2_OE
roadway_plan_segments_2_96roadway_plan_segments_2_96numberDon t Know
roadway_actual_segments_2roadway_actual_segments_2numberType 2: ROADWAY_TYPE-RC Actual(if complete) Estimated (if ongoing) number o
roadway_actual_segments_2_1roadway_actual_segments_2_1numberUrban
roadway_actual_segments_2_1_oeroadway_actual_segments_2_2numberROADWAY_ACTUAL_SEGMENTS_2_1_OE
roadway_actual_segments_2_2roadway_actual_segments_2_3numberRural
roadway_actual_segments_2_2_oeroadway_actual_segments_2_4numberROADWAY_ACTUAL_SEGMENTS_2_2_OE
roadway_actual_segments_2_96roadway_actual_segments_2_5numberDon t Know
roadway_planned_km_2roadway_planned_km_2numberType 2:Planned total km
roadway_planned_km_2_1roadway_planned_km_2_1numberUrban
roadway_planned_km_2_1_oeroadway_planned_km_2_1_oenumberROADWAY_PLANNED_KM_2_1_OE
roadway_planned_km_2_2roadway_planned_km_2_2numberRural
roadway_planned_km_2_2_oeroadway_planned_km_2_2_oenumberROADWAY_PLANNED_KM_2_2_OE
roadway_planned_km_2_96roadway_planned_km_2_96numberDon t Know
roadway_actual_km_2roadway_actual_km_2numberType 2: Actual Estimated total km
roadway_actual_km_2_1roadway_actual_km_2_1numberUrban
roadway_actual_km_2_1_oeroadway_actual_km_2_1_oenumberROADWAY_ACTUAL_KM_2_1_OE
roadway_actual_km_2_2roadway_actual_km_2_2numberRural
roadway_actual_km_2_2_oeroadway_actual_km_2_2_oenumberROADWAY_ACTUAL_KM_2_2_OE
roadway_actual_km_2_96roadway_actual_km_2_96numberDon t know
roadway_plan_life_2roadway_plan_life_2numberType 2: Planned designed economic life of the constructed facility (-1: Don t know, 1: Years:)
roadway_plan_life_2_oeroadway_plan_life_2_oenumberROADWAY_PLAN_LIFE_2_OE
roadway_est_life_2roadway_est_life_2numberType 2: Estimated economic life of the constructed facility (-1: Don t know, 1: Years:)
roadway_est_life_2_oeroadway_est_life_2_oenumberROADWAY_EST_LIFE_2_OE
roadway_rework_req_2roadway_rework_req_2numberROADWAY_TYPE-RC Required rework not completed prior to award end date (1: Yes, minor defects, 2: Yes, major defects, 3: Yes, major requirements not met; estimate not usable: nbsp;, 4: Yes, completely unusable, 5: No, 6: Don t know; explain:)
roadway_rework_req_2_oeroadway_rework_req_2_oetextROADWAY_REWORK_REQ_2_OE
roadway_gps_2_fileroadway_gps_2_filenumberType 2: ROADWAY_GPS : File
roadway_gps_2_gpscoordinatesroadway_gps_2_gpscoordinatestextType 2: ROADWAY_TYPE-RC GPS coordinates for all related construction structures
roadway_gps_2_refusalmsgroadway_gps_2_refusalmsgtextType 2: ROADWAY_GPS : Refusal Message
roadway_location_3roadway_location_3numberType 3: ROADWAY_TYPE-RC Construction location (1: New site no previous construction of any kind, 2: New on site with previous construction of any type, 3: Upgrade Expansion of existing facility, 4: Rehab of existing facility approximately same footprint)
road_conflict_sub_3road_conflict_sub_3numberType 3: Was Is construction in a conflict area? (-1: Don t Know, 1: Yes, 2: No)
roadway_prefab_3roadway_prefab_3numberType 3: Did this facility include any major pre-fabricated components? (-1: Don t Know, 1: Yes, 2: No)
roadway_plan_segments_3roadway_plan_segments_3numberType 3: ROADWAY_TYPE-RC Planned number of segments (by location)
roadway_plan_segments_3_1roadway_plan_segments_3_1numberUrban
roadway_plan_segments_3_1_oeroadway_plan_segments_3_1_1numberROADWAY_PLAN_SEGMENTS_3_1_OE
roadway_plan_segments_3_2roadway_plan_segments_3_2numberRural
roadway_plan_segments_3_2_oeroadway_plan_segments_3_2_1numberROADWAY_PLAN_SEGMENTS_3_2_OE
roadway_plan_segments_3_96roadway_plan_segments_3_96numberDon t Know
roadway_actual_segments_3roadway_actual_segments_3numberType 3: ROADWAY_TYPE-RC Actual(if complete) Estimated (if ongoing) number o
roadway_actual_segments_3_1roadway_actual_segments_3_1numberUrban
roadway_actual_segments_3_1_oeroadway_actual_segments_3_2numberROADWAY_ACTUAL_SEGMENTS_3_1_OE
roadway_actual_segments_3_2roadway_actual_segments_3_3numberRural
roadway_actual_segments_3_2_oeroadway_actual_segments_3_4numberROADWAY_ACTUAL_SEGMENTS_3_2_OE
roadway_actual_segments_3_96roadway_actual_segments_3_5numberDon t Know
roadway_planned_km_3roadway_planned_km_3numberType 3:Planned total km
roadway_planned_km_3_1roadway_planned_km_3_1numberUrban
roadway_planned_km_3_1_oeroadway_planned_km_3_1_oenumberROADWAY_PLANNED_KM_3_1_OE
roadway_planned_km_3_2roadway_planned_km_3_2numberRural
roadway_planned_km_3_2_oeroadway_planned_km_3_2_oenumberROADWAY_PLANNED_KM_3_2_OE
roadway_planned_km_3_96roadway_planned_km_3_96numberDon t Know
roadway_actual_km_3roadway_actual_km_3numberType 3: Actual Estimated total km
roadway_actual_km_3_1roadway_actual_km_3_1numberUrban
roadway_actual_km_3_1_oeroadway_actual_km_3_1_oenumberROADWAY_ACTUAL_KM_3_1_OE
roadway_actual_km_3_2roadway_actual_km_3_2numberRural
roadway_actual_km_3_2_oeroadway_actual_km_3_2_oenumberROADWAY_ACTUAL_KM_3_2_OE
roadway_actual_km_3_96roadway_actual_km_3_96numberDon t know
roadway_plan_life_3roadway_plan_life_3numberType 3: Planned designed economic life of the constructed facility (-1: Don t know, 1: Years:)
roadway_plan_life_3_oeroadway_plan_life_3_oenumberROADWAY_PLAN_LIFE_3_OE
roadway_est_life_3roadway_est_life_3numberType 3: Estimated economic life of the constructed facility (-1: Don t know, 1: Years:)
roadway_est_life_3_oeroadway_est_life_3_oenumberROADWAY_EST_LIFE_3_OE
roadway_rework_req_3roadway_rework_req_3numberROADWAY_TYPE-RC Required rework not completed prior to award end date (1: Yes, minor defects, 2: Yes, major defects, 3: Yes, major requirements not met; estimate not usable: nbsp;, 4: Yes, completely unusable, 5: No, 6: Don t know; explain:)
roadway_rework_req_3_oeroadway_rework_req_3_oenumberROADWAY_REWORK_REQ_3_OE
roadway_gps_3_fileroadway_gps_3_filenumberType 3: ROADWAY_GPS : File
roadway_gps_3_gpscoordinatesroadway_gps_3_gpscoordinatestextType 3: ROADWAY_TYPE-RC GPS coordinates for all related construction structures
roadway_gps_3_refusalmsgroadway_gps_3_refusalmsgnumberType 3: ROADWAY_GPS : Refusal Message
roadway_location_4roadway_location_4numberType 4: ROADWAY_TYPE-RC Construction location (1: New site no previous construction of any kind, 2: New on site with previous construction of any type, 3: Upgrade Expansion of existing facility, 4: Rehab of existing facility approximately same footprint)
road_conflict_sub_4road_conflict_sub_4numberType 4: Was Is construction in a conflict area? (-1: Don t Know, 1: Yes, 2: No)
roadway_prefab_4roadway_prefab_4numberType 4: Did this facility include any major pre-fabricated components? (-1: Don t Know, 1: Yes, 2: No)
roadway_plan_segments_4roadway_plan_segments_4numberType 4: ROADWAY_TYPE-RC Planned number of segments (by location)
roadway_plan_segments_4_1roadway_plan_segments_4_1numberUrban
roadway_plan_segments_4_1_oeroadway_plan_segments_4_1_1numberROADWAY_PLAN_SEGMENTS_4_1_OE
roadway_plan_segments_4_2roadway_plan_segments_4_2numberRural
roadway_plan_segments_4_2_oeroadway_plan_segments_4_2_1numberROADWAY_PLAN_SEGMENTS_4_2_OE
roadway_plan_segments_4_96roadway_plan_segments_4_96numberDon t Know
roadway_actual_segments_4roadway_actual_segments_4numberType 4: ROADWAY_TYPE-RC Actual(if complete) Estimated (if ongoing) number o
roadway_actual_segments_4_1roadway_actual_segments_4_1numberUrban
roadway_actual_segments_4_1_oeroadway_actual_segments_4_2numberROADWAY_ACTUAL_SEGMENTS_4_1_OE
roadway_actual_segments_4_2roadway_actual_segments_4_3numberRural
roadway_actual_segments_4_2_oeroadway_actual_segments_4_4numberROADWAY_ACTUAL_SEGMENTS_4_2_OE
roadway_actual_segments_4_96roadway_actual_segments_4_5numberDon t Know
roadway_planned_km_4roadway_planned_km_4numberType 4:Planned total km
roadway_planned_km_4_1roadway_planned_km_4_1numberUrban
roadway_planned_km_4_1_oeroadway_planned_km_4_1_oenumberROADWAY_PLANNED_KM_4_1_OE
roadway_planned_km_4_2roadway_planned_km_4_2numberRural
roadway_planned_km_4_2_oeroadway_planned_km_4_2_oenumberROADWAY_PLANNED_KM_4_2_OE
roadway_planned_km_4_96roadway_planned_km_4_96numberDon t Know
roadway_actual_km_4roadway_actual_km_4numberType 4: Actual Estimated total km
roadway_actual_km_4_1roadway_actual_km_4_1numberUrban
roadway_actual_km_4_1_oeroadway_actual_km_4_1_oenumberROADWAY_ACTUAL_KM_4_1_OE
roadway_actual_km_4_2roadway_actual_km_4_2numberRural
roadway_actual_km_4_2_oeroadway_actual_km_4_2_oenumberROADWAY_ACTUAL_KM_4_2_OE
roadway_actual_km_4_96roadway_actual_km_4_96numberDon t know
roadway_plan_life_4roadway_plan_life_4numberType 4: Planned designed economic life of the constructed facility (-1: Don t know, 1: Years:)
roadway_plan_life_4_oeroadway_plan_life_4_oenumberROADWAY_PLAN_LIFE_4_OE
roadway_est_life_4roadway_est_life_4numberType 4: Estimated economic life of the constructed facility (-1: Don t know, 1: Years:)
roadway_est_life_4_oeroadway_est_life_4_oenumberROADWAY_EST_LIFE_4_OE
roadway_rework_req_4roadway_rework_req_4numberROADWAY_TYPE-RC Required rework not completed prior to award end date (1: Yes, minor defects, 2: Yes, major defects, 3: Yes, major requirements not met; estimate not usable: nbsp;, 4: Yes, completely unusable, 5: No, 6: Don t know; explain:)
roadway_rework_req_4_oeroadway_rework_req_4_oenumberROADWAY_REWORK_REQ_4_OE
roadway_gps_4_fileroadway_gps_4_filetextType 4: ROADWAY_GPS : File
roadway_gps_4_gpscoordinatesroadway_gps_4_gpscoordinatestextType 4: ROADWAY_TYPE-RC GPS coordinates for all related construction structures
roadway_gps_4_refusalmsgroadway_gps_4_refusalmsgtextType 4: ROADWAY_GPS : Refusal Message
roadway_location_7roadway_location_7numberType 7: ROADWAY_TYPE-RC Construction location (1: New site no previous construction of any kind, 2: New on site with previous construction of any type, 3: Upgrade Expansion of existing facility, 4: Rehab of existing facility approximately same footprint)
road_conflict_sub_7road_conflict_sub_7numberType 7: Was Is construction in a conflict area? (-1: Don t Know, 1: Yes, 2: No)
roadway_prefab_7roadway_prefab_7numberType 7: Did this facility include any major pre-fabricated components? (-1: Don t Know, 1: Yes, 2: No)
roadway_plan_segments_7roadway_plan_segments_7numberType 7: ROADWAY_TYPE-RC Planned number of segments (by location)
roadway_plan_segments_7_1roadway_plan_segments_7_1numberUrban
roadway_plan_segments_7_1_oeroadway_plan_segments_7_1_1textROADWAY_PLAN_SEGMENTS_7_1_OE
roadway_plan_segments_7_2roadway_plan_segments_7_2numberRural
roadway_plan_segments_7_2_oeroadway_plan_segments_7_2_1textROADWAY_PLAN_SEGMENTS_7_2_OE
roadway_plan_segments_7_96roadway_plan_segments_7_96numberDon t Know
roadway_actual_segments_7roadway_actual_segments_7numberType 7: ROADWAY_TYPE-RC Actual(if complete) Estimated (if ongoing) number o
roadway_actual_segments_7_1roadway_actual_segments_7_1numberUrban
roadway_actual_segments_7_1_oeroadway_actual_segments_7_2numberROADWAY_ACTUAL_SEGMENTS_7_1_OE
roadway_actual_segments_7_2roadway_actual_segments_7_3numberRural
roadway_actual_segments_7_2_oeroadway_actual_segments_7_4textROADWAY_ACTUAL_SEGMENTS_7_2_OE
roadway_actual_segments_7_96roadway_actual_segments_7_5numberDon t Know
roadway_planned_km_7roadway_planned_km_7numberType 7:Planned total km
roadway_planned_km_7_1roadway_planned_km_7_1numberUrban
roadway_planned_km_7_1_oeroadway_planned_km_7_1_oenumberROADWAY_PLANNED_KM_7_1_OE
roadway_planned_km_7_2roadway_planned_km_7_2numberRural
roadway_planned_km_7_2_oeroadway_planned_km_7_2_oenumberROADWAY_PLANNED_KM_7_2_OE
roadway_planned_km_7_96roadway_planned_km_7_96numberDon t Know
roadway_actual_km_7roadway_actual_km_7numberType 7: Actual Estimated total km
roadway_actual_km_7_1roadway_actual_km_7_1numberUrban
roadway_actual_km_7_1_oeroadway_actual_km_7_1_oenumberROADWAY_ACTUAL_KM_7_1_OE
roadway_actual_km_7_2roadway_actual_km_7_2numberRural
roadway_actual_km_7_2_oeroadway_actual_km_7_2_oenumberROADWAY_ACTUAL_KM_7_2_OE
roadway_actual_km_7_96roadway_actual_km_7_96numberDon t know
roadway_plan_life_7roadway_plan_life_7numberType 7: Planned designed economic life of the constructed facility (-1: Don t know, 1: Years:)
roadway_plan_life_7_oeroadway_plan_life_7_oetextROADWAY_PLAN_LIFE_7_OE
roadway_est_life_7roadway_est_life_7numberType 7: Estimated economic life of the constructed facility (-1: Don t know, 1: Years:)
roadway_est_life_7_oeroadway_est_life_7_oecalendar_dateROADWAY_EST_LIFE_7_OE
roadway_rework_req_7roadway_rework_req_7numberROADWAY_TYPE-RC Required rework not completed prior to award end date (1: Yes, minor defects, 2: Yes, major defects, 3: Yes, major requirements not met; estimate not usable: nbsp;, 4: Yes, completely unusable, 5: No, 6: Don t know; explain:)
roadway_rework_req_7_oeroadway_rework_req_7_oetextROADWAY_REWORK_REQ_7_OE
roadway_gps_7_fileroadway_gps_7_filetextType 7: ROADWAY_GPS : File
roadway_gps_7_gpscoordinatesroadway_gps_7_gpscoordinatestextType 7: ROADWAY_TYPE-RC GPS coordinates for all related construction structures
roadway_gps_7_refusalmsgroadway_gps_7_refusalmsgtextType 7: ROADWAY_GPS : Refusal Message
roadway_location_5roadway_location_5numberType 5: ROADWAY_TYPE-RC Construction location (1: New site no previous construction of any kind, 2: New on site with previous construction of any type, 3: Upgrade Expansion of existing facility, 4: Rehab of existing facility approximately same footprint)
road_conflict_sub_5road_conflict_sub_5numberType 5: Was Is construction in a conflict area? (-1: Don t Know, 1: Yes, 2: No)
roadway_prefab_5roadway_prefab_5numberType 5: Did this facility include any major pre-fabricated components? (-1: Don t Know, 1: Yes, 2: No)
roadway_plan_segments_5roadway_plan_segments_5numberType 5: ROADWAY_TYPE-RC Planned number of segments (by location)
roadway_plan_segments_5_1roadway_plan_segments_5_1numberUrban
roadway_plan_segments_5_1_oeroadway_plan_segments_5_1_1textROADWAY_PLAN_SEGMENTS_5_1_OE
roadway_plan_segments_5_2roadway_plan_segments_5_2numberRural
roadway_plan_segments_5_2_oeroadway_plan_segments_5_2_1numberROADWAY_PLAN_SEGMENTS_5_2_OE
roadway_plan_segments_5_96roadway_plan_segments_5_96numberDon t Know
roadway_actual_segments_5roadway_actual_segments_5numberType 5: ROADWAY_TYPE-RC Actual(if complete) Estimated (if ongoing) number o
roadway_actual_segments_5_1roadway_actual_segments_5_1numberUrban
roadway_actual_segments_5_1_oeroadway_actual_segments_5_2textROADWAY_ACTUAL_SEGMENTS_5_1_OE
roadway_actual_segments_5_2roadway_actual_segments_5_3numberRural
roadway_actual_segments_5_2_oeroadway_actual_segments_5_4numberROADWAY_ACTUAL_SEGMENTS_5_2_OE
roadway_actual_segments_5_96roadway_actual_segments_5_5numberDon t Know
roadway_planned_km_5roadway_planned_km_5numberType 5:Planned total km
roadway_planned_km_5_1roadway_planned_km_5_1numberUrban
roadway_planned_km_5_1_oeroadway_planned_km_5_1_oenumberROADWAY_PLANNED_KM_5_1_OE
roadway_planned_km_5_2roadway_planned_km_5_2numberRural
roadway_planned_km_5_2_oeroadway_planned_km_5_2_oenumberROADWAY_PLANNED_KM_5_2_OE
roadway_planned_km_5_96roadway_planned_km_5_96numberDon t Know
roadway_actual_km_5roadway_actual_km_5numberType 5: Actual Estimated total km
roadway_actual_km_5_1roadway_actual_km_5_1numberUrban
roadway_actual_km_5_1_oeroadway_actual_km_5_1_oenumberROADWAY_ACTUAL_KM_5_1_OE
roadway_actual_km_5_2roadway_actual_km_5_2numberRural
roadway_actual_km_5_2_oeroadway_actual_km_5_2_oenumberROADWAY_ACTUAL_KM_5_2_OE
roadway_actual_km_5_96roadway_actual_km_5_96numberDon t know
roadway_plan_life_5roadway_plan_life_5numberType 5: Planned designed economic life of the constructed facility (-1: Don t know, 1: Years:)
roadway_plan_life_5_oeroadway_plan_life_5_oetextROADWAY_PLAN_LIFE_5_OE
roadway_est_life_5roadway_est_life_5numberType 5: Estimated economic life of the constructed facility (-1: Don t know, 1: Years:)
roadway_est_life_5_oeroadway_est_life_5_oetextROADWAY_EST_LIFE_5_OE
roadway_rework_req_5roadway_rework_req_5numberROADWAY_TYPE-RC Required rework not completed prior to award end date (1: Yes, minor defects, 2: Yes, major defects, 3: Yes, major requirements not met; estimate not usable: nbsp;, 4: Yes, completely unusable, 5: No, 6: Don t know; explain:)
roadway_rework_req_5_oeroadway_rework_req_5_oetextROADWAY_REWORK_REQ_5_OE
roadway_gps_5_fileroadway_gps_5_filetextType 5: ROADWAY_GPS : File
roadway_gps_5_gpscoordinatesroadway_gps_5_gpscoordinatestextType 5: ROADWAY_TYPE-RC GPS coordinates for all related construction structures
roadway_gps_5_refusalmsgroadway_gps_5_refusalmsgtextType 5: ROADWAY_GPS : Refusal Message
roadway_location_6roadway_location_6numberType 6: ROADWAY_TYPE-RC Construction location (1: New site no previous construction of any kind, 2: New on site with previous construction of any type, 3: Upgrade Expansion of existing facility, 4: Rehab of existing facility approximately same footprint)
road_conflict_sub_6road_conflict_sub_6numberType 6: Was Is construction in a conflict area? (-1: Don t Know, 1: Yes, 2: No)
roadway_prefab_6roadway_prefab_6numberType 6: Did this facility include any major pre-fabricated components? (-1: Don t Know, 1: Yes, 2: No)
roadway_plan_segments_6roadway_plan_segments_6numberType 6: ROADWAY_TYPE-RC Planned number of segments (by location)
roadway_plan_segments_6_1roadway_plan_segments_6_1numberUrban
roadway_plan_segments_6_1_oeroadway_plan_segments_6_1_1numberROADWAY_PLAN_SEGMENTS_6_1_OE
roadway_plan_segments_6_2roadway_plan_segments_6_2numberRural
roadway_plan_segments_6_2_oeroadway_plan_segments_6_2_1numberROADWAY_PLAN_SEGMENTS_6_2_OE
roadway_plan_segments_6_96roadway_plan_segments_6_96numberDon t Know
roadway_actual_segments_6roadway_actual_segments_6numberType 6: ROADWAY_TYPE-RC Actual(if complete) Estimated (if ongoing) number o
roadway_actual_segments_6_1roadway_actual_segments_6_1numberUrban
roadway_actual_segments_6_1_oeroadway_actual_segments_6_2numberROADWAY_ACTUAL_SEGMENTS_6_1_OE
roadway_actual_segments_6_2roadway_actual_segments_6_3numberRural
roadway_actual_segments_6_2_oeroadway_actual_segments_6_4numberROADWAY_ACTUAL_SEGMENTS_6_2_OE
roadway_actual_segments_6_96roadway_actual_segments_6_5numberDon t Know
roadway_planned_km_6roadway_planned_km_6numberType 6:Planned total km
roadway_planned_km_6_1roadway_planned_km_6_1numberUrban
roadway_planned_km_6_1_oeroadway_planned_km_6_1_oenumberROADWAY_PLANNED_KM_6_1_OE
roadway_planned_km_6_2roadway_planned_km_6_2numberRural
roadway_planned_km_6_2_oeroadway_planned_km_6_2_oenumberROADWAY_PLANNED_KM_6_2_OE
roadway_planned_km_6_96roadway_planned_km_6_96numberDon t Know
roadway_actual_km_6roadway_actual_km_6numberType 6: Actual Estimated total km
roadway_actual_km_6_1roadway_actual_km_6_1numberUrban
roadway_actual_km_6_1_oeroadway_actual_km_6_1_oenumberROADWAY_ACTUAL_KM_6_1_OE
roadway_actual_km_6_2roadway_actual_km_6_2numberRural
roadway_actual_km_6_2_oeroadway_actual_km_6_2_oenumberROADWAY_ACTUAL_KM_6_2_OE
roadway_actual_km_6_96roadway_actual_km_6_96numberDon t know
roadway_plan_life_6roadway_plan_life_6numberType 6: Planned designed economic life of the constructed facility (-1: Don t know, 1: Years:)
roadway_plan_life_6_oeroadway_plan_life_6_oenumberROADWAY_PLAN_LIFE_6_OE
roadway_est_life_6roadway_est_life_6numberType 6: Estimated economic life of the constructed facility (-1: Don t know, 1: Years:)
roadway_est_life_6_oeroadway_est_life_6_oenumberROADWAY_EST_LIFE_6_OE
roadway_rework_req_6roadway_rework_req_6numberROADWAY_TYPE-RC Required rework not completed prior to award end date (1: Yes, minor defects, 2: Yes, major defects, 3: Yes, major requirements not met; estimate not usable: nbsp;, 4: Yes, completely unusable, 5: No, 6: Don t know; explain:)
roadway_rework_req_6_oeroadway_rework_req_6_oetextROADWAY_REWORK_REQ_6_OE
roadway_gps_6_fileroadway_gps_6_filetextType 6: ROADWAY_GPS : File
roadway_gps_6_gpscoordinatesroadway_gps_6_gpscoordinatestextType 6: ROADWAY_TYPE-RC GPS coordinates for all related construction structures
roadway_gps_6_refusalmsgroadway_gps_6_refusalmsgtextType 6: ROADWAY_GPS : Refusal Message
roadway_disroadway_distextWhat is the closest major city or town to the project site (50k people or more)?
road_bridge_itemroad_bridge_itemnumberDid Does this sub-award include any road bridges-related items? (0: No, 1: Yes)
road_bridge_typeroad_bridge_typenumberFor bridges along roads, please select all that apply and provide as much inform
road_bridge_type_1road_bridge_type_1numberSteel, 4 or more lanes
road_bridge_type_2road_bridge_type_2numberSteel, 2 lanes
road_bridge_type_3road_bridge_type_3numberConcrete, 4 or more lanes
road_bridge_type_4road_bridge_type_4numberConcrete, 2 lanes
road_bridge_type_5road_bridge_type_5numberWood, 4 or more lanes
road_bridge_type_6road_bridge_type_6numberWood, 2 lanes
road_bridge_type_7road_bridge_type_7numberOther, please specify
road_bridge_type_7_oeroad_bridge_type_7_oetextROAD_BRIDGE_TYPE_7_OE
road_bridge_location_1road_bridge_location_1numberType 1: Construction location (1: New site no previous construction of any kind, 2: New on site with previous construction of any type, 3: Upgrade Expansion of existing facility, 4: Rehab of existing facility approximately same footprint)
road_bridge_conflict_1road_bridge_conflict_1numberType 1: Was Is construction in a conflict area? (-1: Don t Know, 1: Yes, 2: No)
road_bridge_prefab_1road_bridge_prefab_1numberType 1: Did this facility include any major pre-fabricated components? (0: No, 1: Yes, 96: Don t know)
road_bridge_plan_sites_1road_bridge_plan_sites_1numberType 1: Planned number of sites
road_bridge_plan_sites_1_1road_bridge_plan_sites_1_1numberUrban:
road_bridge_plan_sites_1_1_oeroad_bridge_plan_sites_1_2numberROAD_BRIDGE_PLAN_SITES_1_1_OE
road_bridge_plan_sites_1_96road_bridge_plan_sites_1_3numberDon t know
road_bridge_plan_sites_1_2road_bridge_plan_sites_1_4numberRural:
road_bridge_plan_sites_1_2_oeroad_bridge_plan_sites_1_5numberROAD_BRIDGE_PLAN_SITES_1_2_OE
road_bridge_act_sites_1road_bridge_act_sites_1numberType 1: Actual Estimated number of sites
road_bridge_act_sites_1_1road_bridge_act_sites_1_1numberUrban:
road_bridge_act_sites_1_1_oeroad_bridge_act_sites_1_1_1numberROAD_BRIDGE_ACT_SITES_1_1_OE
road_bridge_act_sites_1_96road_bridge_act_sites_1_96numberDon t know
road_bridge_act_sites_1_2road_bridge_act_sites_1_2numberRural:
road_bridge_act_sites_1_2_oeroad_bridge_act_sites_1_2_1numberROAD_BRIDGE_ACT_SITES_1_2_OE
road_bridge_span_1road_bridge_span_1numberType 1: Typical span (m) (-1: Don t know, 1: 5, 2: 41768, 3: 41927, 4: 15969, 5: 20 or more)
road_bridge_span_no_1road_bridge_span_no_1numberType 1: Typical number of spans (-1: Don t know, 1: (No. of spans))
road_bridge_span_no_1_oeroad_bridge_span_no_1_oenumberROAD_BRIDGE_SPAN_NO_1_OE
road_bridge_plan_life_1road_bridge_plan_life_1numberType 1: Planned designed economic life of the constructed facility (in years). (-1: Don t know, 1: (No. of years))
road_bridge_plan_life_1_oeroad_bridge_plan_life_1_oenumberROAD_BRIDGE_PLAN_LIFE_1_OE
road_bridge_est_life_1road_bridge_est_life_1numberType 1: Estimated economic life of the constructed facility (years) (-1: Don t know, 1: (No. of years))
road_bridge_est_life_1_oeroad_bridge_est_life_1_oenumberROAD_BRIDGE_EST_LIFE_1_OE
road_bridge_rework_1road_bridge_rework_1numberType 1: Rework required, and not completed prior to award end date (1: Yes, minor defects, 2: Yes, major defects, 3: Yes, major requirements not met; estimate not usable:, 4: Yes, completely unusable, 5: No, 6: Don t know; explain:)
road_bridge_rework_1_oeroad_bridge_rework_1_oenumberROAD_BRIDGE_REWORK_1_OE
road_bridge_gps_1_fileroad_bridge_gps_1_filenumberType 1: ROAD_BRIDGE_GPS : File
road_bridge_gps_1_gpscoordinatesroad_bridge_gps_1numberType 1: GPS coordinates for all related construction structures (provide coordin
road_bridge_gps_1_refusalmsgroad_bridge_gps_1_refusalmsgnumberType 1: ROAD_BRIDGE_GPS : Refusal Message
road_bridge_location_2road_bridge_location_2numberType 2: Construction location (1: New site no previous construction of any kind, 2: New on site with previous construction of any type, 3: Upgrade Expansion of existing facility, 4: Rehab of existing facility approximately same footprint)
road_bridge_conflict_2road_bridge_conflict_2numberType 2: Was Is construction in a conflict area? (-1: Don t Know, 1: Yes, 2: No)
road_bridge_prefab_2road_bridge_prefab_2numberType 2: Did this facility include any major pre-fabricated components? (0: No, 1: Yes, 96: Don t know)
road_bridge_plan_sites_2road_bridge_plan_sites_2numberType 2: Planned number of sites
road_bridge_plan_sites_2_1road_bridge_plan_sites_2_1numberUrban:
road_bridge_plan_sites_2_1_oeroad_bridge_plan_sites_2_2numberROAD_BRIDGE_PLAN_SITES_2_1_OE
road_bridge_plan_sites_2_96road_bridge_plan_sites_2_3numberDon t know
road_bridge_plan_sites_2_2road_bridge_plan_sites_2_4numberRural:
road_bridge_plan_sites_2_2_oeroad_bridge_plan_sites_2_5numberROAD_BRIDGE_PLAN_SITES_2_2_OE
road_bridge_act_sites_2road_bridge_act_sites_2numberType 2: Actual Estimated number of sites
road_bridge_act_sites_2_1road_bridge_act_sites_2_1numberUrban:
road_bridge_act_sites_2_1_oeroad_bridge_act_sites_2_1_1numberROAD_BRIDGE_ACT_SITES_2_1_OE
road_bridge_act_sites_2_96road_bridge_act_sites_2_96numberDon t know
road_bridge_act_sites_2_2road_bridge_act_sites_2_2numberRural:
road_bridge_act_sites_2_2_oeroad_bridge_act_sites_2_2_1numberROAD_BRIDGE_ACT_SITES_2_2_OE
road_bridge_span_2road_bridge_span_2numberType 2: Typical span (m) (-1: Don t know, 1: 5, 2: 41768, 3: 41927, 4: 15969, 5: 20 or more)
road_bridge_span_no_2road_bridge_span_no_2numberType 2: Typical number of spans (-1: Don t know, 1: (No. of spans))
road_bridge_span_no_2_oeroad_bridge_span_no_2_oetextROAD_BRIDGE_SPAN_NO_2_OE
road_bridge_plan_life_2road_bridge_plan_life_2numberType 2: Planned designed economic life of the constructed facility (in years). (-1: Don t know, 1: (No. of years))
road_bridge_plan_life_2_oeroad_bridge_plan_life_2_oenumberROAD_BRIDGE_PLAN_LIFE_2_OE
road_bridge_est_life_2road_bridge_est_life_2numberType 2: Estimated economic life of the constructed facility (years) (-1: Don t know, 1: (No. of years))
road_bridge_est_life_2_oeroad_bridge_est_life_2_oenumberROAD_BRIDGE_EST_LIFE_2_OE
road_bridge_rework_2road_bridge_rework_2numberType 2: Rework required, and not completed prior to award end date (1: Yes, minor defects, 2: Yes, major defects, 3: Yes, major requirements not met; estimate not usable:, 4: Yes, completely unusable, 5: No, 6: Don t know; explain:)
road_bridge_rework_2_oeroad_bridge_rework_2_oetextROAD_BRIDGE_REWORK_2_OE
road_bridge_gps_2_fileroad_bridge_gps_2_filenumberType 2: ROAD_BRIDGE_GPS : File
road_bridge_gps_2_gpscoordinatesroad_bridge_gps_2textType 2: GPS coordinates for all related construction structures (provide coordin
road_bridge_gps_2_refusalmsgroad_bridge_gps_2_refusalmsgtextType 2: ROAD_BRIDGE_GPS : Refusal Message
road_bridge_location_3road_bridge_location_3numberType 3: Construction location (1: New site no previous construction of any kind, 2: New on site with previous construction of any type, 3: Upgrade Expansion of existing facility, 4: Rehab of existing facility approximately same footprint)
road_bridge_conflict_3road_bridge_conflict_3numberType 3: Was Is construction in a conflict area? (-1: Don t Know, 1: Yes, 2: No)
road_bridge_prefab_3road_bridge_prefab_3numberType 3: Did this facility include any major pre-fabricated components? (0: No, 1: Yes, 96: Don t know)
road_bridge_plan_sites_3road_bridge_plan_sites_3numberType 3: Planned number of sites
road_bridge_plan_sites_3_1road_bridge_plan_sites_3_1numberUrban:
road_bridge_plan_sites_3_1_oeroad_bridge_plan_sites_3_2numberROAD_BRIDGE_PLAN_SITES_3_1_OE
road_bridge_plan_sites_3_96road_bridge_plan_sites_3_3numberDon t know